Building consents
Residential building consents in Riversdale
Below: 64 residential consents we hold in Riversdale, searchable and on the map.
Residential consents on record in Riversdale
Individual building consents we hold, each on its property: 64 from 1 Jul 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating12
3 in the last 12 months · typically $5,852
- Garages, sheds and carports12
typically $34k
- Alterations and additions8
1 in the last 12 months · typically $22k
- New homes6
2 in the last 12 months · typically $710k
- Plumbing, drainage and wastewater2
typically $32k
- Insulation1
typically $3,000
- Minor dwellings and sleepouts1
typically $90k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $973kConstruct new 3 bdrm dwg with attached gge 6 Hereford Street, Riversdale
- $650kThree-bdrm dwg 183m2 12 Hereford Street, Riversdale
- $9,500Remove old inbuilt fire, turn area into alcove & fit new maxen fire 98 Liverpool Street, Riversdale
- $6,400Installation of solid wood burner (metro rad plus) 20 York Road, Riversdale
- $6,000Install new wood burner model masport Akaroa ll 25 Riversdale Waikaia Road, Riversdale
64 consents
- Fires and heating$6,400
Installation of solid wood burner (metro rad plus)
- Alterations and additions$9,500
Remove old inbuilt fire, turn area into alcove & fit new maxen fire
- Fires and heating$4,500
Install yunca xander insert wood burner
- Fires and heating$6,000
Install new wood burner model masport Akaroa ll
- New homes$650k
Three-bdrm dwg 183m2
- New homes$973k
Construct new 3 bdrm dwg with attached gge
- Alterations and additions$1
Amendment - change of pole depths into ground
- Garages, sheds and carports$20k
Stand alone 2 bay pole shed with no floor or foundation
- Garages, sheds and carports$30k
Add shower & toilet to existing gge
- Garages, sheds and carports$70k
Timber pole shed, 3 bay lean-to
- Fires and heating$7,000
Free standing solid fuel heater project description: install of a metro were rad leg into the living room, including a new metro eco flue kit, soaker flashing & dektite flashing in the roof
- Alterations and additions$1
Amendment - changes to foundation & floor slab covered by engineer. Single layer of se72 reinforcing mesh, concrete block nib walls, underfloor heating added to ensuite, bathrm & laundry with 120mm underslab poly to entire dwg.
- New homes$770k
New four bdrm house with attached dbl gge & new three bay shed
- New homes$900k
Construct new 3 bdrm dwg & attached gge consisting of concrete floor slab, timber wall framing with timber trusses with rockcote exterior claddings & colorsteel roof. Installation of free standing wood burner.
- Garages, sheds and carports$33k
Construction of detached dbl gge
- Garages, sheds and carports$80k
Three storey new dwg, attached gge. Council ww amendment 1: slope remediation design
- Fires and heating$5,000
Install masport Rangitata beveled inbuilt woodburner
- Fires and heating$7,000
Install blaze king chinook ck20.NZ heater in dwg
- Minor dwellings and sleepouts$90k
RBW new sleepout cabin with ensuite
- Alterations and additions$100k
Alterations to dwg
- Fires and heating$5,000
Alt to dwg - installation of Metro Ultra Xtreme Rad ULEB, freestanding, dry, woodburner, CAC - 200997
- Insulation$3,000
install insulmax blown insulation into exterior walls
- New homes$180k
R1 - new detached dwg.
- Garages, sheds and carports$100k
Updated: bathrm, laundry & store in shed
- Fires and heating$7,000
Remove existing fire & install a yunca monte legmodel rural wood burner on existing hearth
ResidentialCommercial The dots are this page of the list.
Suburbs in Riversdale
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.