Building consents
Residential building consents in Ruatoria
Below: 37 residential consents we hold in Ruatoria, searchable and on the map.
Residential consents on record in Ruatoria
Individual building consents we hold, each on its property: 37 from 1 Sep 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating12
2 in the last 12 months · typically $5,500
- Alterations and additions6
1 in the last 12 months · typically $185k
- Relocated buildings6
1 in the last 12 months · typically $115k
- Plumbing, drainage and wastewater4
typically $40k
- New homes2
typically $525k
- Insulation1
typically $8,000
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $400kRbw - alt to existing residence. Internal reconfiguration for living, bathrm, kitchen at lower level, master bdrm, 2 ensuites, bar & bdrm at upper floor. Replacement of existing join 8 Amiria Avenue, Ruatoria
- $30kConnect existing dwg & relocated second-hand portable ablution building to new septic system 67 Tuparoa Road, Ruatoria
- $7,000Install freestanding woodsman serene logfire 1 Te Huinga Avenue, Ruatoria
- $5,000Install freestanding firenzo contessa logfire with wetback 36 Amiria Avenue, Ruatoria
37 consents
- Fires and heating$5,000
Install freestanding firenzo contessa logfire with wetback
- Alterations and additions$400k
Rbw - alt to existing residence. Internal reconfiguration for living, bathrm, kitchen at lower level, master bdrm, 2 ensuites, bar & bdrm at upper floor. Replacement of existing join
- Fires and heating$7,000
Install freestanding woodsman serene logfire
- Relocated buildings$30k
Connect existing dwg & relocated second-hand portable ablution building to new septic system
- Relocated buildings$100k
Connect one relocatable cabin & two relocatable cabins with bathrooms to foundations & install septic system & water tank
- Fires and heating$5,000
Install freestanding woodsman serene logfire with existing wetback
- Relocated buildings$25k
Relocate sleepout
- Alterations and additions$18k
Remove existing internal load bearing wall & replace with beam
- Fires and heating$8,500
Install inbuilt yunca xander ca logfire
- Alterations and additions$250k
Extension, alterations & additions to existing dwg
- Insulation$8,000
Exemption - insulmax - insulating existing walls.
- Plumbing, drainage and wastewater$60k
Connect existing dwg to foundations & install septic system
- Plumbing, drainage and wastewater$80k
Install septic system
- New homes$450k
New dwg, install septic system & water tank & install freestanding masport r1200 pedestal logfire
- New homes$600k
New dwg & detached gge
- Fires and heating$3,200
Install freestanding yunca logfire
- Relocated buildings$150k
Connect relocated dwg to foundations, remove internal wall, install septic system & water tank & install freestanding masport MacKenzie r10000 logfire with wetback
- Fires and heating$14k
Install freestanding firenzo topaz rural logfire
- Relocated buildings$180k
Connect relocated dwg to foundations, install septic system & water tank & install freestanding masport r1200 logfire
- Alterations and additions$100k
Reinstatement of fire damaged kitchen including replacement of kitchen window, new kitchen, insulate some exterior walls, bathrm refurbishment, new hwc with laundry fittings & install freestanding woodsman Tarras mkiii logfire
- Alterations and additions$250k
Remove internal wall to create open plan living area, extension to dwg & replace existing timber joinery
- Fires and heating$6,000
Install freestanding firenzo vision ag logfire
- Relocated buildings$130k
Relocate dwg & install septic system
- Fires and heating$3,000
Install freestanding woodsman matai ecr mkiii logfire
- Fires and heating$8,500
Install freestanding milan ardore rural logfire
ResidentialCommercial The dots are this page of the list.
Suburbs in Ruatoria
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.