Building consents
Building consents in Shelly Beach
Below: 7 consents we hold in Shelly Beach, searchable and on the map.
Consents on record in Shelly Beach
Individual building consents we hold, each on its property: 7 from 1 Nov 2021 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions2
typically $57k
- Fires and heating2
typically $5,301
- Pools and spas1
1 in the last 12 months · typically $15k
- Repairs, recladding and strengthening1
1 in the last 12 months · typically $180k
- Commercial alterations1
typically $100k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $180kRbw - reclad - partial re-clad to existing two storey level dwg with new horizontal bevelback weatherboard on cavity, glass house to be removed, full reclad to gge walls to plywood cladding on 16 Shelly Beach Road
- $15kInstall new pool fence. 26 Omana Avenue
7 consents
- Repairs, recladding and strengthening$180k
Rbw - reclad - partial re-clad to existing two storey level dwg with new horizontal bevelback weatherboard on cavity, glass house to be removed, full reclad to gge walls to plywood cladding on
- Pools and spas$15k
Install new pool fence.
- Alterations and additions$80k
Installation of 38 700l inground, preformed, ceramic composition swimming pool & fence surround
- Alterations and additions$34k
Rbw - internal alt to single floor dwg to include bathrm alt.
- Fires and heating$4,999
Install woodfire (masport r1200)
- Fires and heating$5,603
Install new fire & flue (maxen Henley 250-l)
- Commercial alterations$100k
Rbw - proposed works will provide new entry, internal access to bedrooms. New-bdrm & ensuite allows small second bdrm to be used as an office. Removal of bathrm in original dwg gives extra living space.
ResidentialCommercial The dots are this page of the list.
Near Shelly Beach
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.