Building consents
Building consents in Halfmoon Bay / Oban
Below: 30 consents we hold in Halfmoon Bay / Oban, searchable and on the map.
Consents on record in Halfmoon Bay / Oban
Individual building consents we hold, each on its property: 30 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating7
2 in the last 12 months · typically $5,000
- New homes4
1 in the last 12 months · typically $423k
- Alterations and additions4
typically $6,500
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $10k
- Garages, sheds and carports1
typically $250k
- Minor dwellings and sleepouts1
typically $17k
- Decks, pergolas and verandahs1
typically $10k
- Repairs, recladding and strengthening1
typically $1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $500kConstruct 4 bdrm dwg 8 Kowhai Lane
- $10kExternal drainage consisting of connection to holding tank pump & connection to existing sewer connection 42 Mapau Road
- $6,000Remove existing fire & flue system & install new woodsman stag in same location as existing fire installed under bld 2014 49891 1 15 Horseshoe Bay Road
- $4,000Installation of a masport r1200 wood burner 25 Horseshoe Bay Road
30 consents
- Fires and heating$4,000
Installation of a masport r1200 wood burner
- Fires and heating$6,000
Remove existing fire & flue system & install new woodsman stag in same location as existing fire installed under bld 2014 49891 1
- Plumbing, drainage and wastewater$10k
External drainage consisting of connection to holding tank pump & connection to existing sewer connection
- New homes$500k
Construct 4 bdrm dwg
- Repairs, recladding and strengthening$1
Amendment - change configuration of subfloor . Delete row of piles, increase joist size & spacing
- Alterations and additions$1
Amendment - minor change to brace positions to first floor
- Fires and heating$5,000
Replacement of a coal /wood burner coc 2012installation of a new wood burner free-standing in same position metro fire tiny rad leg 11kw wood burner
- Fires and heating$5,000
Installation of woodsman the stag onto insulated hearth
- Alterations and additions$200k
Alterations - extend house, add three bedrooms & bathrm
- Decks, pergolas and verandahs$10k
Amendment - extend first floor deck & change location of stairs. Relocate exterior door to first floor, relocate windows to sth wall of garage. Step roof above internal stairwell & change pitch to steepen roof above stairs .
- Alterations and additions$10k
Install new pyro fire with wetback connection
- Garages, sheds and carports$250k
Extend house to add bdrm above gge
- Fires and heating$30k
Install new solid fuel cooker, new hwc, widen doorways to lounge
- New homes$265k
New 4 bdrm timber framed home with prenailed frame, timber subfloor, colorsteel roofing & timber bevel backed weatehr board cladding, electric hotwater & heating
- Minor dwellings and sleepouts$17k
Shed being converted into sleep out with amenities
- Fires and heating$5,000
Free-standing jayline fr400 solid fuel heater
- Fires and heating$1,500
Well strahler diesel burner installation. flue installation oil tank 220lt
- New homes$425k
New three bdrm dwg
- Alterations and additions$3,000
Installation of nectre big bakers fire
- New homes$420k
New three bdrm dwg
- Fires and heating$2,000
Install a reconditioned freestanding yunca oscar wood burner & new flue in the kitchen of the property in exact location location of the previous gillies multi fuel burner, in accordance with the yunca installation instructions
- Alterations and additions$10k
Renovate bathrm & dining rooms
- Fires and heating$5,000
Freestanding masport r1600 fire with wetback connection
- Fires and heating$4,500
Freestanding woodsman rmf fire with existing wetback connection
- Alterations and additions$6,000
Replace existing fire place with freestanding
ResidentialCommercial The dots are this page of the list.
Near Halfmoon Bay / Oban
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.