- Alterations and additions16
2 in the last 12 months · typically $10k
- New homes14
1 in the last 12 months · typically $426k
- Fires and heating12
3 in the last 12 months · typically $5,000
- Garages, sheds and carports4
typically $53k
- Repairs, recladding and strengthening3
typically $1
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $10k
- Decks, pergolas and verandahs1
typically $10k
- Minor dwellings and sleepouts1
typically $17k
- Commercial alterations1
typically $170k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $500kConstruct 4 bdrm dwg 8 Kowhai Lane, Halfmoon Bay / Oban
- $10kExternal drainage consisting of connection to holding tank pump & connection to existing sewer connection 42 Mapau Road, Halfmoon Bay / Oban
- $8,000Amendment to replace all existing framing with new 140mm to external walls & 90mm internal. Change from bevelback to rusticated. 6 Deep Bay Road, Stewart Island/Rakiura
- $6,000Remove existing fire & flue system & install new woodsman stag in same location as existing fire installed under bld 2014 49891 1 15 Horseshoe Bay Road, Halfmoon Bay / Oban
- $4,000Installation of a masport r1200 wood burner 25 Horseshoe Bay Road, Halfmoon Bay / Oban
70 consents
- Fires and heating$4,000
Freestanding masport wood burner
- Fires and heating$4,000
Installation of a masport r1200 wood burner
- Fires and heating$6,000
Remove existing fire & flue system & install new woodsman stag in same location as existing fire installed under bld 2014 49891 1
- Plumbing, drainage and wastewater$10k
External drainage consisting of connection to holding tank pump & connection to existing sewer connection
- Alterations and additions$1
Amendment - due to the remote location of the site, the contractor has requested the option of using driven timber piles. Piles are to be in accordance with as/nzs3604:2011. As built documentation required. Work to be supervised by aj design #112236
- New homes$500k
Construct 4 bdrm dwg
- Alterations and additions$8,000
Amendment to replace all existing framing with new 140mm to external walls & 90mm internal. Change from bevelback to rusticated.
- Repairs, recladding and strengthening$1
Amendment - change configuration of subfloor . Delete row of piles, increase joist size & spacing
- New homes$750k
Construction of a single storey standalone dwg. Timber framed subfloor with trussed & raftered roof
- Alterations and additions$1
Amendment - internal layout change. Master bdrm & second bdrm have swapped locations. Subfloor unchanged. Bracing updated to suit. Roof framing adjusted to suit.
- Alterations and additions$1
Amendment - minor change to brace positions to first floor
- Fires and heating$5,000
Replacement of a coal /wood burner coc 2012installation of a new wood burner free-standing in same position metro fire tiny rad leg 11kw wood burner
- Fires and heating$5,000
Installation of woodsman the stag onto insulated hearth
- New homes$250k
Build one bdrm house
- Alterations and additions$15k
Amendment - additional floor area to incorporate bdrm 2 & extend bathrm.
- Alterations and additions$1
Amendment - new skylights & roof sarking
- New homes$485k
New two bed dwg with attached carport
- Alterations and additions$200k
Alterations - extend house, add three bedrooms & bathrm
- Decks, pergolas and verandahs$10k
Amendment - extend first floor deck & change location of stairs. Relocate exterior door to first floor, relocate windows to sth wall of garage. Step roof above internal stairwell & change pitch to steepen roof above stairs .
- Repairs, recladding and strengthening$1
Amendment - deleted piles set into concrete & replaced by driven piles design by structural engineer
- Alterations and additions$10k
Install new pyro fire with wetback connection
- Alterations and additions$40k
It is proposed to construct a storage/ablution building
- Garages, sheds and carports$250k
Extend house to add bdrm above gge
- New homes$258k
Build 2 bdrm home no gge
- New homes$500k
Build new 145 m2 three bdrm house
ResidentialCommercial The dots are this page of the list.
Suburbs in Stewart Island
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.