Building consents
Building consents in Tanners Point
Below: 11 consents we hold in Tanners Point, searchable and on the map.
Consents on record in Tanners Point
Individual building consents we hold, each on its property: 11 from 1 Oct 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating3
1 in the last 12 months · typically $7,500
- Plumbing, drainage and wastewater1
typically $12k
- New homes1
typically $1.6m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $7,500Installation of freestanding maxen St claire solid fuel heater 237 Tanners Point Road
11 consents
- Fires and heating$7,500
Installation of freestanding maxen St claire solid fuel heater
- New homes$1.6m
Rbw - construction of a two-storey detached dwg, comprising of three bedrooms, two bathrooms, storage room, dbl internal gge & covered outdoor living area. Includes stormwater tank, onsit
- Fires and heating$5,500
Installation of freestanding solid fuel fire - metro extreme
- Fires and heating$8,000
Installation of freestanding solid fuel fire - firenzo viking
- Plumbing, drainage and wastewater$12k
New on site effluent system
- Plumbing, drainage and wastewater$19k
Coa - new septic system
- Garages, sheds and carports$45k
Adding a dbl gge to existing dwg
- Alterations and additions$19k
Oset system
- Decks, pergolas and verandahs$10k
Deck replacement
- Fires and heating$5,000
Installation of replacement freestanding solid fuel heater
- Plumbing, drainage and wastewater$23k
On site effluent system
ResidentialCommercial The dots are this page of the list.
Near Tanners Point
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.