Building consents

Residential building consents in Clifton

Below: 16 residential consents we hold in Clifton, searchable and on the map.

Consents we hold161 in the last 12 monthsSearch them ↓

Residential consents on record in Clifton

Individual building consents we hold, each on its property: 16 from 1 Jan 2020 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating6

    1 in the last 12 months · typically $6,750

  2. Alterations and additions1

    typically $20k

  3. Plumbing, drainage and wastewater1

    typically $100k

  4. Pools and spas1

    typically $25k

  5. Relocated buildings1

    typically $75k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01122202420252026November 2023: 1December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 0August 2024: 0September 2024: 0October 2024: 0November 2024: 0December 2024: 2January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 1June 2025: 0July 2025: 1August 2025: 1September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 1April 2026: 0May 2026: 0June 2026: 0July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $6,000Install freestanding wood burner 146 Clifton Road

16 consents

  1. Fires and heating$6,000

    Install freestanding wood burner

    146 Clifton Road · 1 Mar 2026 · 26/0177

  2. Relocated buildings$75k

    Relocate pre-built pod & install waste water design.

    146 Clifton Road · 1 Aug 2025 · ABA20250496

  3. Pools and spas$25k

    Install glass pool barrier

    1 Lansdowne Street · 1 Jul 2025 · 25/0487

  4. Fires and heating$6,000

    Install freestanding pellet fire

    690 Abel Tasman Drive · 1 May 2025 · 25/0383

  5. Fires and heating$12k

    Install freestanding wood burner with existing wetback

    761 Bird Road · 1 Dec 2024 · 24/1003

  6. Fires and heating$8,000

    Install freestanding wood burner

    761 Bird Road · 1 Dec 2024 · 24/1004

  7. Alterations and additions$20k

    Internal & external alterations

    140 Rocklands Road · 1 Nov 2023 · 23/0979

  8. Fires and heating$5,000

    Install woodsman freestanding wood burner

    705 Abel Tasman Drive · 1 Apr 2023 · 23/0392

  9. Fires and heating$7,500

    Replace existing wood burner with woodsman freestanding

    17 Lansdowne Street · 1 Feb 2023 · 23/0130

  10. Plumbing, drainage and wastewater$100k

    Alterations to existing dwg & upgrade on-site

    142 Rocklands Road · 1 Jun 2022 · 22/0580

  11. Fires and heating$2,000

    Install sculpt freestanding wood burner

    142 Rocklands Road · 1 Sep 2021 · 21/1077

  12. Repairs, recladding and strengthening$135k

    Repairs & alterations to existing dwg

    129 Clifton Road · 1 Jun 2021 · 21/0260

  13. Fires and heating$4,500

    Install freestanding metro wood burner

    4 Clifton Road · 1 Feb 2021 · 21/0122

  14. Alterations and additions$10k

    Geo-technical remediation work which includes palisade pole

    11 Upper Rocklands Road · 1 Nov 2020 · CA201148

  15. Fires and heating$2,000

    Install masport freestanding wood burner

    14 Clifton Road · 1 Oct 2020 · 20/1233

  16. New homes$450k

    Construct new dwg with masport freestanding wood burner

    680 Abel Tasman Drive · 1 Jan 2020 · 19/1410

ResidentialCommercial The dots are this page of the list.

Near Clifton

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Tasman District Council.