Building consents
Residential building consents in Tangiteroria
Below: 12 residential consents we hold in Tangiteroria, searchable and on the map.
Residential consents on record in Tangiteroria
Individual building consents we hold, each on its property: 12 from 1 Nov 2019 to 1 Jul 2024. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Relocated buildings4
typically $73k
- Fires and heating3
typically $6,000
- New homes2
typically $573k
- Garages, sheds and carports1
typically $200k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
12 consents
- Fires and heating$5,000
Removal of old woodburner & hearth & replace new metro tiny rad woody & metro flu kit. New dektite & flashing
- Fires and heating$6,000
Decommision & removal of old fireplace & flu, disconnect existing weback replace with new metro wee rad woody, with new wet back kit replace with standard flu kit & new dektite & flashing 1070x1080 hearth made of concrete with pebble
- Relocated buildings$3,500
Second hand relocatable dwg - small extension, foundations & drainage onsite ww amendment 1: add of kent Murchison solid fuel heater, extra pile, reduce bearer size
- Fires and heating$6,500
Replacement fire metro xtreme rad leg solid fuel wood burner
- New homes$845k
4 bdrm new dwg. Onsite ww
- Relocated buildings$70k
2nd hand relocatable four bdrm dwg. Onsite ww
- Relocated buildings$100k
Second hand relocatable dwg - small extension, foundations & drainage onsite ww
- New homes$300k
New 3 bdrm, 2 bathrm, single storey dwg
- Garages, sheds and carports$200k
Alt to existing house- new timber decks, new internal gge, new bathrooms, new external joinery, internal alterations - private ww
- Relocated buildings$75k
Second hand relocatable 3 bdrm dwg - foundations & drainage private ww
- Alterations and additions$12k
Install wagener fairburn with wetback
- Plumbing, drainage and wastewater$20k
New septic system
ResidentialCommercial The dots are this page of the list.
Suburbs in Tangiteroria
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.