Building consents
Building consents in Tapora
Below: 5 consents we hold in Tapora, searchable and on the map.
Consents on record in Tapora
Individual building consents we hold, each on its property: 5 from 1 Oct 2020 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes1
1 in the last 12 months · typically $771k
- Garages, sheds and carports1
typically $60k
- Relocated buildings1
typically $49k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $771kRbw - single level house with timber weatherboard & stratum vertical weatherboard wall claddings & gaf asphalt shingle roof; 6 bedrooms, 3 bathrooms & internal access dbl garages; underground 1 Journeys End, Tāpora
5 consents
- New homes$771k
Rbw - single level house with timber weatherboard & stratum vertical weatherboard wall claddings & gaf asphalt shingle roof; 6 bedrooms, 3 bathrooms & internal access dbl garages; underground
- Garages, sheds and carports$60k
new private storage shed for gge.
- Relocated buildings$49k
Rbw- relocate an existing house Greenlane. New foundations & baseboards. New water tanks & septic system. Power & services connections. New crossing & driveway.
- Alterations and additions$50k
Rbw - existing 2 storey dwg to have a minor extension constructed on the ground floor. This will add space to the existing kitchen, creating a large pantry & extend an existing bdrm, with a new lean-to roof over.
- Fires and heating$3,310
Remove existing fire & install new wood fire & flue.
ResidentialCommercial The dots are this page of the list.
Suburbs in Tapora
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.