Building consents
Building consents in Wharewaka
Below: 412 consents we hold in Wharewaka, searchable and on the map.
Consents on record in Wharewaka
Individual building consents we hold, each on its property: 412 from 1 Jul 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes171
10 in the last 12 months · typically $620k
- Alterations and additions46
6 in the last 12 months · typically $14k
- Fires and heating19
2 in the last 12 months · typically $6,000
- Garages, sheds and carports9
typically $65k
- Decks, pergolas and verandahs3
1 in the last 12 months · typically $10k
- Multiple homes3
typically $1.4m
- Relocated buildings2
2 in the last 12 months · typically $150k
- Pools and spas2
1 in the last 12 months · typically $73k
- Repairs, recladding and strengthening2
1 in the last 12 months · typically $155k
- New commercial buildings2
typically $715k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.4m4 bdrm dwg with attached gge & open plan living 19 Makomako Crescent
- $950kNew two-storey 3-bdrm dwg with attached internal 36 Harakeke Drive
- $900kNew three-bdrm dwg with media room, & triple 23 Kopakopa Crescent
- $895kNew single level, 4 bdrm home 50 Ngaru Crescent
- $864kErect a new dwg with attached gge & metro fire 15 Neinei Place
412 consents
- New homes$895k
New single level, 4 bdrm home
- New homes$864k
Erect a new dwg with attached gge & metro fire
- New homes$600k
Proposed new single-storey dwg, with 3 bedrooms, 2.5
- Alterations and additions$100k
A new membrane roof over existing metal tray roof. A new
- New homes$400k
New 3 bdrm dwg with attached gge. (unit 120)
- New homes$528k
3 bdrm dwg with attached gge
- New homes$900k
New three-bdrm dwg with media room, & triple
- New homes$1.4m
4 bdrm dwg with attached gge & open plan living
- Alterations and additions$2,000
Amendment to the approved building consent 1. Updated the
- Pools and spas$126k
6.7m x 4m standard inground Mayfair fibreglass pool (1.2 -
- Fires and heating$9,176
Installation of a new yunca ruby uleb freestanding
- Fires and heating$7,418
Installation of a new wagener flair freestanding woodburner.
- New homes$950k
New two-storey 3-bdrm dwg with attached internal
- Relocated buildings$210k
New two bdrm relocatable show home. Show home not to be connected to services. Gas califont not to be installed until relocated to future site.
- New homes$481k
New dwg with 3 bedrooms & dbl gge
- Repairs, recladding and strengthening$300k
Re-clad existing roof & walls, new lounge add to
- Alterations and additions$445k
Media, lounge & alfresco extensions, & various internal
- Alterations and additions$12k
Remove 3 x openings, replace with 1 x lintel & large glazing unit. Add lintels & raise downstands to 2 x non consented openings
- Relocated buildings$90k
Relocation of existing dwg, new decks & services
- Decks, pergolas and verandahs$65k
Deck extension at first floor, replace ground floor external
- Alterations and additions$30k
Upgrade existing bathrooms. Add new internal walls to
- Alterations and additions$450k
Alt & add of an existing 3 bdrm single
- New homes$864k
New three bdrm dwg with study, media room, attached gge
- Pools and spas$20k
Installation of pool fencing only
- Garages, sheds and carports$65k
Alterations to relocate front door. Convert gge into
ResidentialCommercial The dots are this page of the list.
Near Wharewaka
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.