Building consents
Building consents in Poike
Below: 39 consents we hold in Poike, searchable and on the map.
Consents on record in Poike
Individual building consents we hold, each on its property: 39 from 1 Sep 2019 to 1 Oct 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes13
typically $560k
- Fires and heating3
typically $5,000
- Alterations and additions2
typically $19k
- Commercial alterations1
typically $88k
- Repairs, recladding and strengthening1
typically $240k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
39 consents
- New homes$550k
Erect a single-level three-bdrm dwg with attached dbl gge.
- Fires and heating$7,000
Installation of a replacement freestanding masport Kaituna solid fuel heater.
- New homes$594k
Construct two level three bdrm dwg with attached single gge
- New homes$594k
Construct two level three bdrm dwg with attached dbl gge
- New homes$427k
Res/farm-four bdrm dwg with attached dbl gge
- Commercial alterations$88k
New shed/workshop
- Alterations and additions$18k
Remove walls to open kitchen into hallway with new access into lounge to create open living
- Fires and heating$5,000
Installation of ss200l clean air solid fuel heater
- New homes$990k
Erect two-storey four-bdrm dwg with attached dbl gge.
- New homes$818k
Construct a two level four bdrm dwg with attached dbl gge
- New homes$532k
Erect single-level three-bdrm dwg with attached dbl gge.
- New homes$560k
Erect two-storey three-bdrm dwg with attached dbl gge.
- Fires and heating$5,000
Install freestanding metro wee rad base solid fuel heater with wetback
- New homes$531k
Erect single level three bdrm dwg with attached single gge.
- New homes$653k
Erect single-level three-bdrm dwg with attached dbl gge.
- Alterations and additions$21k
Bathrm add within existing dwg
- Repairs, recladding and strengthening$240k
Alt to existing dwg. Roof/wall reclad. Eaves extension. New dbl glazing joinery. Internal alterations & deck extension
- New homes$500k
Construct a two level three bdrm detached dwg with attached dbl gge
- New homes$500k
Construct single level three bdrm dwg with attached dbl gge
- New homes$657k
Construct two storey four bdrm dwg with attached one & a half gge
- New homes$1.1m
Dwg
- New homes$480k
Erect single level three bdrm dwg with attached dbl gge.
- New homes$397k
Erect single level three bdrm dwg with attached dbl gge & retaining walls
- New homes$372k
Erect single level three bdrm dwg with attached dbl gge with timber retaining wall.
- New homes$120k
Construct transportable single level three bdrm dwg to gib stage only.
ResidentialCommercial The dots are this page of the list.
Near Poike
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.