Building consents
Building consents in Te Kao
Below: 179 consents we hold in Te Kao, searchable and on the map.
Consents on record in Te Kao
Individual building consents we hold, each on its property: 179 from 12 Aug 1993 to 29 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations18
5 in the last 12 months
- Relocated buildings6
- Alterations and additions3
- Plumbing, drainage and wastewater2
1 in the last 12 months
- Decks, pergolas and verandahs1
1 in the last 12 months
- Other new buildings1
- Pools and spas1
typically $100k
- Fires and heating1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
179 consents
- Plumbing, drainage and wastewater
Proposed 2nd hand dwelling, add septic tank and field, add water tanks & soak trench for overflow
- Commercial alterations
Foundations, deck, ramps, steps & services for OMB classrooms
- Commercial alterations
Demolition of existing school pool pump shed, proposed new pool changing & pump block with access route.
- Commercial alterations
Block 4 Addition and re-roof of existing school hall storeroom, internal refurbishment of existing school hall
- Commercial alterations
Block 1 existing timber ramp & deck remediation including ramp replacement & deck extension. New timber decking to be installed on top of existing concrete deck in front of classrooms, and concrete steps remediation work with new handrails. Existing timber landing & stairs full replacement at the back of block1 room 10. Type 4 fire alarm upgrade within the fire report & emergency lighting not included in this application and had already been approved under separate building consent.
- Decks, pergolas and verandahs
Foundations, deck and services for relocated portacom
- Commercial alterations
Sitewide Fire Alarm Upgrade to Type 4 Including Block 1, 4 and Portacom Classroom Block
- Alterations and additions
Extension to Existing Building
- Commercial alterations
Extension/Alteration to Clinic
- Relocated buildings
Foundations for Relocate Dwelling Construct Covered Deck and Install Stormwater and Sewer Drainage - SITE 4 Te Paki Dunes
- Relocated buildings
Foundations for Relocate Dwelling Construct Covered Deck and Install Stormwater and Sewer Drainage - SITE 5 Te Paki Dunes
- Relocated buildings
Foundations for Relocate Dwelling Construct Covered Deck and Install Stormwater and Sewer Drainage - SITE 2 Te Paki Dunes
- Relocated buildings
Foundations for Relocate Dwelling Construct Covered Deck and Install Stormwater and Sewer Drainage - SITE 3 Te Paki Dunes
- Relocated buildings
Foundations for Relocate Dwelling Construct Covered Deck and Install Stormwater and Sewer Drainage - SITE 1 Te Paki Dunes
- Relocated buildings
Foundations for Relocate Dwelling Construct Covered Deck and Install Stormwater and Sewer Drainage - SITE 6 Te Paki Dunes
- Alterations and additions
Extension to Existing Building
- Commercial alterations
Factory Build – New Dwelling with gabel end roof
- Commercial alterations
Factory Build – New Dwelling with gabel end roof
- Commercial alterations
Factory Build – New Dwelling with gabel end roof
- Commercial alterations
Factory Build – New Dwelling with gabel end roof
- Commercial alterations
Factory Build – New Dwelling with gabel end roof
- Commercial alterations
Factory Build – New Dwelling with gabel end roof
- Commercial alterations
Factory Build – New Dwelling with gabel end roof
- Commercial alterations
Factory Build – New Dwelling with gabel end roof
- Commercial alterations
Factory Build – New Dwelling with gabel end roof
ResidentialCommercial The dots are this page of the list.
Suburbs in Te Kao
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.