Building consents
Commercial building consents in Thames
Below: 7 commercial consents we hold in Thames, searchable and on the map.
Commercial consents on record in Thames
Individual building consents we hold, each on its property: 7 from 1 Feb 2020 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations2
1 in the last 12 months · typically $53k
- New commercial buildings2
typically $613k
- Fit-outs1
typically $90k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $95kRbw -new upper floor timber deck with glass balustrade, new lower floor timber deck, partially enclosed gym room & internal alt to laundry. 68 Hauraki Road, Orongo
7 consents
- Commercial alterations$95k
Rbw -new upper floor timber deck with glass balustrade, new lower floor timber deck, partially enclosed gym room & internal alt to laundry.
- New commercial buildings$625k
Rbw - two new two-storey townhouses, each with 2 bedrooms, 2 bathrooms, open plan kitchen & living, & office. Connect to town sewer, stormwater to on-site soakage.
- Commercial alterations$10k
Install bathrm & septic sysytem into workshop
- Fit-outs$90k
Main roof extension, repitch to flat roof area, new roof cladding. Removal of bay windows, making good, new window installation. Removal of shower, making good, bathrm fitout. New internal stairs.
- New commercial buildings$600k
New 1 bdrm 2.5 bathrm dwg with studio & office in roof space. Attached single gge.
- New commercial buildings$489k
Construction of a two bdrm, 1 music room, 1 office domestic dwg with an attached dbl gge
- Commercial alterations$90k
New detached gge. Lower floor is a new masonry basement/gge. The upper level has a new open plan office space.
ResidentialCommercial The dots are this page of the list.
Suburbs in Thames
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.