Building consents
Building consents in Ngārimu Bay
Below: 10 consents we hold in Ngārimu Bay, searchable and on the map.
Consents on record in Ngārimu Bay
Individual building consents we hold, each on its property: 10 from 1 Aug 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating2
1 in the last 12 months · typically $6,000
- Alterations and additions2
typically $40k
- Other new buildings1
1 in the last 12 months · typically $5.5m
- Insulation1
typically $4,000
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $5.5mRbw - new three-storey, 21-unit res development features two building blocks with precast concrete walls, timber framed walls with fibre cement claddings, aluminium screens, insulateand hydrau 1 Arthur Road
- $6,000Installation of a metro smart insert. 10 Patui Avenue
10 consents
- Other new buildings$5.5m
Rbw - new three-storey, 21-unit res development features two building blocks with precast concrete walls, timber framed walls with fibre cement claddings, aluminium screens, insulateand hydrau
- Fires and heating$6,000
Installation of a metro smart insert.
- Alterations and additions$50k
Bathrm renovation
- Alterations and additions$30k
Build ensuite install new lift
- Fires and heating$6,000
Installation of a metro wee rad woodfire
- Insulation$4,000
Install insulmax retrofit wall insulation to exterior walls as per codemark certificate cm70028
- Garages, sheds and carports$90k
Proposed detached dbl gge
- Garages, sheds and carports$70k
New shed
- Plumbing, drainage and wastewater$24k
Install new septic tank & effluent mound
- New homes$350k
Construct new single level three bdrm main dwg & new single level two bdrm ancillary dwg.
ResidentialCommercial The dots are this page of the list.
Near Ngārimu Bay
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.