Building consents
Residential building consents in Tikitiki
Below: 10 residential consents we hold in Tikitiki, searchable and on the map.
Residential consents on record in Tikitiki
Individual building consents we hold, each on its property: 10 from 1 Jul 2019 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes2
typically $554k
- Minor dwellings and sleepouts1
1 in the last 12 months · typically $300k
- Garages, sheds and carports1
typically $88k
- Alterations and additions1
typically $45k
- Repairs, recladding and strengthening1
typically $80k
- Fires and heating1
typically $6,500
- Plumbing, drainage and wastewater1
typically $350k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $300kAdditions to dwg - erect a two-storey one-bdrm sleepout with a kitchen & freestanding maxen cargil. Alterations to the existing bathrm next to kitchen to include a new tiled shower. Bedroo 121A Maraehara Valley Road, Tikitiki
10 consents
- Minor dwellings and sleepouts$300k
Additions to dwg - erect a two-storey one-bdrm sleepout with a kitchen & freestanding maxen cargil. Alterations to the existing bathrm next to kitchen to include a new tiled shower. Bedroo
- Fires and heating$6,500
Install freestanding yunca Hobson logfire
- Repairs, recladding and strengthening$80k
Raise & repile flood damaged dwg, remove internal walls, install new slider, & partial reclad
- Plumbing, drainage and wastewater$350k
Alt & extend existing dwg & upgrade septic system
- Garages, sheds and carports$88k
Erect gge
- New homes$767k
Rbw new single-storey dwg comprising four bedrooms, three bathrooms, kitchen, & dbl gge. New 1.5 metre retaining wall to northern & southern boundaries, & private drainage
- Alterations and additions$45k
Extend existing living room & alt entry
- New homes$340k
New dwg with attached gge, install septic system, water tank & install freestanding jayline fr300w logfire with wetback
- Fires and heating$2,268
Install freestanding woodsman ecr novo logfire
- Relocated buildings$100k
Relocate dwg, new shed & internal alterations to part of the shed
ResidentialCommercial The dots are this page of the list.
Suburbs in Tikitiki
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.