Building consents
Building consents in Fortrose
Below: 8 consents we hold in Fortrose, searchable and on the map.
Consents on record in Fortrose
Individual building consents we hold, each on its property: 8 from 1 Aug 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes2
typically $838k
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $8,200
- Garages, sheds and carports1
typically $1
- Fires and heating1
typically $4,500
- Minor dwellings and sleepouts1
typically $2,000
- Relocated buildings1
typically $80k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $8,200Add toilet & basin with small hwc to hobby room 49 Neva Street
8 consents
- Plumbing, drainage and wastewater$8,200
Add toilet & basin with small hwc to hobby room
- New homes$343k
New 2 bdrm dwg
- New homes$1.3m
New 4 bdrm house, open living space (2 covered areas), separate lounge & an attached dbl gge.
- Garages, sheds and carports$1
Amendment - removal of mitek pole shed from the consented plans
- Fires and heating$4,500
Fire installation - freestanding masport extreme pedestal
- Minor dwellings and sleepouts$2,000
COA - add tiny home
- Relocated buildings$80k
The building works involve the relocation of a 1-bdrm house. The house will be constructed on driven timber piles. The storm water will be drained to a storage tank, & foul water will be drained to the underground tank on site.
- Fires and heating$3,500
Install used yunca blenz multi fuel heater
ResidentialCommercial The dots are this page of the list.
Near Fortrose
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.