Building consents
Building consents in Tuatapere
Below: 63 consents we hold in Tuatapere, searchable and on the map.
Consents on record in Tuatapere
Individual building consents we hold, each on its property: 63 from 1 Jul 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating18
2 in the last 12 months · typically $5,000
- Alterations and additions11
4 in the last 12 months · typically $15k
- Multiple homes3
typically $1.6m
- New homes3
typically $650k
- Garages, sheds and carports2
typically $75k
- Relocated buildings2
typically $115k
- Fit-outs1
typically $284k
- Decks, pergolas and verandahs1
typically $20k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $15kAlterations to existing bathrm. 27 Orawia Road, Tuatapere
- $9,500Installation of a yunca monte euro multi-fuel- wet 70 Happy Valley Road, Happy Valley
- $5,000Installation of a reconditioned yunca blenz through exisiting penetration 18 Grove Burn Road, Tuatapere
- $1,500Install new freestanding hunter fire 233 McInerney Road, Te Waewae
- $1Amendment- b2 durability modification - only include the installation of the log burner (the proposed kitchen sink work was not carried out) & change from shop front area to res as it is an open plan room with the rest of the house. 85 Half Mile Road, Tuatapere
63 consents
- Alterations and additions$15k
Alterations to existing bathrm.
- Alterations and additions$1,500
Install new freestanding hunter fire
- Fires and heating$5,000
Installation of a reconditioned yunca blenz through exisiting penetration
- Fires and heating$9,500
Installation of a yunca monte euro multi-fuel- wet
- Alterations and additions$1
Amendment- b2 durability modification - only include the installation of the log burner (the proposed kitchen sink work was not carried out) & change from shop front area to res as it is an open plan room with the rest of the house.
- Alterations and additions$1
Amendment- changes to bracing, revised floor plans & elevations, revised plumbing & drainage,100mm step to gge floor, gge wall framing 90mm, drainage channels for height clearance,
- Garages, sheds and carports$100k
New Totalspan barn
- Alterations and additions$1
Amendment - durability modification
- Fires and heating$8,700
Installation of a yunca monte multi-fuel
- Fires and heating$4,200
Install free standing woodsman tarra mk iii.
- Alterations and additions$198k
Alt to north wall of existing residence, construction of new entry & construction of proprietary shed.
- Fires and heating$5,000
Installation of solid fuel heater - woodsman kanaku
- Relocated buildings$50k
Resite secondhand dwg (future lot 1) & two retaining walls for future subdivision
- Fires and heating$9,000
Installation of a yunca monte base ca sub 1.0
- Fires and heating$3,000
Woodsman kanuku sfh
- Multiple homes$281k
Construction of 2 attached dwgs.
- Multiple homes$2.1m
rbw six new two storey dwgs 3xduplex, including four bedrooms, 3 bathrooms, flexi room, kitchen, laundry, single gge & private drainage.
- Fires and heating$5,000
Replace old Yunca freestanding fire with a new Masport Brunner MKII freestanding wood burner
- Decks, pergolas and verandahs$20k
Amendment - new deck to the north of the building at the first floor level
- New homes$650k
Construction of dwg with attached gge
- Multiple homes$1.6m
Three new multi-unit dwgs
- New homes$50k
New 51.8sqm single level two bdrm dwg with bathrm & kitchen & 28.8sqm deck.
- Relocated buildings$180k
Connect relocatable dwg to foundations, install septic system & water tank
- Fires and heating$5,000
Installation of kent Rata insert fire
- Fit-outs$284k
Stage 1 change the use of the building from a category 1 building to a category 2 building. Internal fit out of the building & internal linings with insulation. Creating a second floor. Installing all plumbing & drainage services to create a habitat
ResidentialCommercial The dots are this page of the list.
Suburbs in Tuatapere
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.