Building consents
Building consents in Omori
Below: 97 consents we hold in Omori, searchable and on the map.
Consents on record in Omori
Individual building consents we hold, each on its property: 97 from 1 Jul 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions14
1 in the last 12 months · typically $50k
- Fires and heating12
2 in the last 12 months · typically $5,900
- Decks, pergolas and verandahs8
2 in the last 12 months · typically $41k
- Garages, sheds and carports7
1 in the last 12 months · typically $49k
- Plumbing, drainage and wastewater4
1 in the last 12 months · typically $15k
- New homes4
typically $566k
- Minor dwellings and sleepouts2
typically $123k
- Commercial alterations1
1 in the last 12 months · typically $350k
- Demolition1
typically $70k
- Retaining walls1
typically $38k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $350kDemolish existing internal partition walls to block o classroom & construct new internal partition walls. Add lspm bathrm, kitchenette, accessible ramp, deck, & fenced outdoor area. Replace one 4 Kaimanawa Street
- $64kErect a new steel building for gge & storage. 9 Barron Place
- $40kAmendment changes to approved plans as attached 12 Ngapera Way
- $37kProposed additional new deck add to the existing 8 Rangiwhero Street
- $30kLocate a portacom to site. Once onsite install a kitchen for 33 Kaimanawa Street
97 consents
- Decks, pergolas and verandahs$18k
New 1st floor timber deck to replace existing.
- Garages, sheds and carports$64k
Erect a new steel building for gge & storage.
- Fires and heating$5,500
Install new freestanding metro wee rad - woody log burner
- Alterations and additions$40k
Amendment changes to approved plans as attached
- Plumbing, drainage and wastewater$30k
Locate a portacom to site. Once onsite install a kitchen for
- Decks, pergolas and verandahs$37k
Proposed additional new deck add to the existing
- Fires and heating$7,301
Installation of a new woodsman serene petite uleb
- Commercial alterations$350k
Demolish existing internal partition walls to block o classroom & construct new internal partition walls. Add lspm bathrm, kitchenette, accessible ramp, deck, & fenced outdoor area. Replace one
- Garages, sheds and carports$95k
Additions & alterations to existing dwg - add carport, bathrm, new ensuite to existing bdrm
- New homes$376k
Rbw construct 4 bdrm dwg with attached gge
- Alterations and additions$49k
New window seat & bathrm to lower floor. Modify upper
- Garages, sheds and carports$51k
Erect a new steel building for gge & storage
- Decks, pergolas and verandahs$30k
Replace an existing level 1 deck with new enlarged structure
- Fires and heating$8,106
Installation of new yunca monte multi-fuel euro freestanding detached dwgs
- New homes$663k
New dwg
- Decks, pergolas and verandahs$300k
New bdrm extension. Re-build existing veranda new detached dwgs
- Fires and heating$6,000
Install a new yunca insert wood burner in existing brick chimney cavity.
- Alterations and additions$120k
A 2 storey add for extended living area &a new bdrm
- Fires and heating$6,000
Installation of a new masport Cashmere uleb woodburner. A
- Alterations and additions$250k
Single storey add, linea weatherboards. Metal tile roof to detached dwg
- Fires and heating$5,775
Installation of new metro wee rad legs eco woodburner. A
- Alterations and additions$20k
Upgrade bathrm, replace shower & install vanity. Create ensuite with shower wc & vanity
- Demolition$70k
Demolish existing boat shed & deck above. Demolish deck in
- Fires and heating$5,669
Installation of a solid fuel heater to manufacturers specifications woodsman Tasman
- Alterations and additions$10k
Alt to dwg - internal alterations for a kitchen
ResidentialCommercial The dots are this page of the list.
Near Omori
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.