Building consents
Building consents in Waddington
Below: 8 consents we hold in Waddington, searchable and on the map.
Consents on record in Waddington
Individual building consents we hold, each on its property: 8 from 1 Apr 2020 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions4
1 in the last 12 months · typically $81k
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $280k
- Fires and heating1
typically $6,400
- Repairs, recladding and strengthening1
typically $95k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $280kConstruction of siting, foundation & drainage & for new 1 Waddington Road, Waddington
- $150kRemove downstairs bath & replace with shower. Install two new bathrooms updstairs, change gge door to french doors 5 Henry Street, Waddington
8 consents
- Alterations and additions$150k
Remove downstairs bath & replace with shower. Install two new bathrooms updstairs, change gge door to french doors
- Plumbing, drainage and wastewater$280k
Construction of siting, foundation & drainage & for new
- Repairs, recladding and strengthening$95k
Change of use: first floor offices to dwg. Reclad of exterior, new aluminum joinery, internal walls, kitchen, bathrm, laundry & new deck
- Alterations and additions$10k
Construct a new mud room in the existing laundry & relocate the laundry to the car gge
- Alterations and additions$12k
Dwg alterations - bathrm renovation
- Fires and heating$6,400
Installation of a solid fuel heater
- Alterations and additions$200k
Housing (multi-unit dwg) - retrofit of existing dwg to improve thermal performance & modernise layout; removal & replacement of plasterboard linings, new smoke alarm & bracing layouts
- Alterations and additions$150k
Domestic dwg alterations & additions
ResidentialCommercial The dots are this page of the list.
Suburbs in Waddington
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.