Building consents
Building consents in Ōmiha
Below: 62 consents we hold in Ōmiha, searchable and on the map.
Consents on record in Ōmiha
Individual building consents we hold, each on its property: 62 from 1 Sep 2019 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes9
1 in the last 12 months · typically $490k
- Alterations and additions7
2 in the last 12 months · typically $19k
- Fires and heating6
1 in the last 12 months · typically $5,000
- Garages, sheds and carports4
typically $64k
- Minor dwellings and sleepouts3
2 in the last 12 months · typically $97k
- Retaining walls2
1 in the last 12 months · typically $68k
- Plumbing, drainage and wastewater2
typically $15k
- Commercial alterations1
typically $280k
- Pools and spas1
typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $350kRbw - new 2-bdrm dwg with bathrm & kitchen, dining & lounge, with fireplace. Decks front & back with external stairs to bridge & path to parking bay, including multiple retaining wal 57 Glen Brook Road
- $97kRbw - construct new deck to existing dwg. Install new laundry door to existing dwg. Construct new sleepout 59 Fairview Crescent
- $95kDriveway with timber pole retaining wall 18 O'Brien Road
- $12kAlt internal layout to form open plan kitchen & dining in dwg 1 Upland Road
- $10kRbw - the proposed project is a small renovation to an existing home. This includes the add a new deck & the replacement of an existing window into a stacker slider door for deck access. 132 Fairview Crescent
62 consents
- Minor dwellings and sleepouts$97k
Rbw - construct new deck to existing dwg. Install new laundry door to existing dwg. Construct new sleepout
- Alterations and additions$12k
Alt internal layout to form open plan kitchen & dining in dwg
- Minor dwellings and sleepouts$3,651
Sfh fixed fee: installation of a solid fuel heater & a sea zone flue kit (warmington studio stove)
- Retaining walls$95k
Driveway with timber pole retaining wall
- New homes$350k
Rbw - new 2-bdrm dwg with bathrm & kitchen, dining & lounge, with fireplace. Decks front & back with external stairs to bridge & path to parking bay, including multiple retaining wal
- Fires and heating$6,900
Installation of a solid fuel heater to manufacturers specifications metro tiny rad leg wood fire.
- Alterations and additions$10k
Rbw - the proposed project is a small renovation to an existing home. This includes the add a new deck & the replacement of an existing window into a stacker slider door for deck access.
- Garages, sheds and carports$90k
Rbw - replace existing carport.
- New homes$400k
Rbw - construction of a new 2 storey (in part) steel frame dwg with 3 bedrooms, wood burner & retaining walls.
- Garages, sheds and carports$470k
Rbw - pbc e2e: new gge add including roof over entry area. Extension of existing dormer roof to upper floor.
- Retaining walls$40k
C2 - remove timbers stairs. New retaining wall, timber decks & stairs.
- Alterations and additions$19k
Rbw - add of lower floor bathrm & fixtures & internal stair access from main floor level to lower level to existing res dwg.
- Alterations and additions$40k
Rbw - proposed subfloor foundation for a single level dwg. Main building structure from joist upward is a separate building consent lodged with Far North District council, as it is to be built of
- New homes$200k
Rbw-construction of a single dwg. Installation of a new wastewater disposal system. Construction of a vehicle crossing
- New homes$990k
Rbw- construction of a two storey detached dwg comprising three bedrooms, two bathrooms & a detached single gge. Includes onsite wastewater system, retaining walls & solid fuel heater. Rem
- Fires and heating$2,955
Installation of a solid fuel heater with a sea zone flue kit (masport Akaroa)
- Alterations and additions$200k
R3 - alt to existing three-storey detached dwg. Removal of existing wall & installation of new beam. Internal reconfiguration to ground floor.
- Minor dwellings and sleepouts$250k
Rbw - replacement gge & sleepout
- New homes$490k
Rbw - new two bdrm one bathrm residence clad with jsc vertical timber & dimond brownbuilt 900 with timber slat deck to existing site.
- Commercial alterations$280k
rbw - extension to a small res building to replace an inadequate older portion. The extension will include lounge, dining rooms, as well as a raised entry, breakfast bar & toilet. Small decks are to be added either side.
- Alterations and additions$150k
Rbw -stage 1 of intended 2 stages - involves construction of new driveway, masonry retaining walls, parking platform & associated drainage.
- New homes$800k
Rbw - new 3 bdrm house & parking platform. Wooden deck with pergola roof & balustrade, carpark subfloor, ext timber handrail fixed to retaining wall, proposed wastewater treatment system innoflow
- Pools and spas$50k
installation of a pre-moulded in-ground swimming pool & associated pool fencing.
- Plumbing, drainage and wastewater$8,000
Internal sewer connection & rodding eye. Possibly require consent for stormwater tank. Drainage only.
- Alterations and additions$2,000
Internal alterations
ResidentialCommercial The dots are this page of the list.
Near Ōmiha
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.