Building consents
Residential building consents in Waitaki Bridge
Below: 13 residential consents we hold in Waitaki Bridge, searchable and on the map.
Residential consents on record in Waitaki Bridge
Individual building consents we hold, each on its property: 13 from 1 Dec 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions4
typically $350k
- Fires and heating3
1 in the last 12 months · typically $5,000
- New homes1
1 in the last 12 months · typically $700k
- Plumbing, drainage and wastewater1
typically $13k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $700kConstruction 2 x 3 bdrm, 1 bathrm dwgs with attached gge & installation of oasis clearwater series 2000 wastewater systems 227 Ludemann Road, Papakaio
- $5,000Installation of a free-standing woodsman Tasman mkii woodburner & heat saver flue kit with dektite plan flashing 220 Hilderthorpe Road, Hilderthorpe
13 consents
- Fires and heating$5,000
Installation of a free-standing woodsman Tasman mkii woodburner & heat saver flue kit with dektite plan flashing
- New homes$700k
Construction 2 x 3 bdrm, 1 bathrm dwgs with attached gge & installation of oasis clearwater series 2000 wastewater systems
- Alterations and additions$40k
Internal alterations to existing dwg
- Alterations and additions$800k
Other res/farm - additions & alterations to dwg, including new plumbing & stormwater disposal.
- Alterations and additions$300k
Add & alt to dwg - add of rumpus room, laundry/bathrm & upper level including deck, relocation & extension of kitchen/living area & installation of Masport Akaroa wood stacker, LEBs, freestanding, dry, woodburner
- Alterations and additions$400k
Rbw - scope of work is for new kitchen-dining-living layout with pantry, dbl gge with internal access. New common bathrm & toilet. New staircase to access basement & upper storey. Master bdrm, study, ensuite, walk-in on upper floor.
- Fires and heating$28k
Foundations, wagener sparky ru woodburner & naturalflow
- Fires and heating$5,000
Installation of a firenzo contessa rural woodburner & flue kit
- Plumbing, drainage and wastewater$13k
New wastewater drainage system
- New homes$750k
Construction of a 2 level 3 bdrm, 2 bathrm dwg with kent
- Fires and heating$5,000
Installation of a free-standing jayline fr300 rural woodburner &
- Fires and heating$4,000
Installation of a free-standing yunca monte base woodburner & flue
- Fires and heating$5,000
Remove existing wet-back connection, fire & flue. Install masport
ResidentialCommercial The dots are this page of the list.
Suburbs in Waitaki Bridge
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.