Building consents

Residential building consents in Waitati

Below: 112 residential consents we hold in Waitati, searchable and on the map.

Consents we hold11212 in the last 12 monthsSearch them ↓

Residential consents on record in Waitati

Individual building consents we hold, each on its property: 112 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. New homes22

    1 in the last 12 months · typically $450k

  2. Fires and heating18

    4 in the last 12 months · typically $7,000

  3. Alterations and additions13

    2 in the last 12 months · typically $18k

  4. Plumbing, drainage and wastewater7

    2 in the last 12 months · typically $17k

  5. Relocated buildings4

    1 in the last 12 months · typically $45k

  6. Garages, sheds and carports3

    1 in the last 12 months · typically $45k

  7. Repairs, recladding and strengthening3

    typically $100k

  8. Minor dwellings and sleepouts3

    typically $80k

  9. Multiple homes3

    typically $529k

  10. Decks, pergolas and verandahs1

    1 in the last 12 months · typically $80k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0123202420252026November 2023: 3December 2023: 1January 2024: 0February 2024: 1March 2024: 2April 2024: 0May 2024: 1June 2024: 3July 2024: 1August 2024: 2September 2024: 1October 2024: 1November 2024: 0December 2024: 1January 2025: 1February 2025: 1March 2025: 1April 2025: 1May 2025: 0June 2025: 3July 2025: 0August 2025: 0September 2025: 1October 2025: 1November 2025: 1December 2025: 0January 2026: 1February 2026: 1March 2026: 1April 2026: 0May 2026: 0June 2026: 2July 2026: 3August 2026: 3September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $1mNew dwg, install water tanks & septic system 2 Orokonui Road
  2. $80kEnclose deck, replace balustrade 4 McLachlan Street
  3. $45kErect shed 1032 Mount Cargill Road
  4. $30kFoundation & services for a relocatable building 3 Short Street
  5. $29kReplace septic tank with effluent dispersal field; New: D B Howe 30 Shortcut Road

112 consents

  1. Fires and heating$5,000

    Install solid fuel burner in dwg

    31 Harvey Street · 1 Aug 2026 · 1167/26

  2. Garages, sheds and carports$45k

    Erect shed

    1032 Mount Cargill Road · 1 Aug 2026 · 415/26

  3. Plumbing, drainage and wastewater$19k

    Install septic system & effluent field

    35 Double Hill Road · 1 Aug 2026 · 921/26

  4. Decks, pergolas and verandahs$80k

    Enclose deck, replace balustrade

    4 McLachlan Street · 1 Jul 2026 · 481/26

  5. Alterations and additions$1

    Amendment to aba-2025-617 - alt bracing, shower, & windows, delete cupboards, tub & bath, change barn slider to cavity slider

    210 Doctors Point Road · 1 Jul 2026 · 910/26

  6. Fires and heating$8,000

    Install solid fuel burner in dwg

    67 Doctors Point Road · 1 Jul 2026 · 940/26

  7. Fires and heating$8,000

    Install solid fuel burner in dwg

    108 Doctors Point Road · 1 Jun 2026 · 693/26

  8. Relocated buildings$30k

    Foundation & services for a relocatable building

    3 Short Street · 1 Jun 2026 · BLD/2026/303109/1

  9. Alterations and additions$17k

    Amendment to aba-2021-525 - retain laundry, convert bdrm to secondary bathrm (wet-floor shower), & amend septic system design

    1516 Dunedin-Waitati Road · 1 Mar 2026 · 4/26

  10. Fires and heating$7,500

    Amendment to aba-2025-617 - install maxen kinmont 350 leg heater in dwg

    210 Doctors Point Road · 1 Feb 2026 · 77/26

  11. Plumbing, drainage and wastewater$29k

    Replace septic tank with effluent dispersal field; New: D B Howe

    30 Shortcut Road · 1 Jan 2026 · 1912/25

  12. New homes$1m

    New dwg, install water tanks & septic system

    2 Orokonui Road · 1 Nov 2025 · 1296/25

  13. Fires and heating$3,000

    R2 - replacement of inbuilt wood burner with metro smart insert in 2 storey detached dwg.

    5 Foyle Street · 1 Oct 2025 · 563173

  14. New homes$150k

    New dwg, install focus slimfocus suspended heater & septic system

    26 White Road · 1 Sep 2025 · 723/25

  15. New homes$365k

    New two bdrm dwg (relocate to QLDC on completion) housing - detached

    10 Ree Street · 1 Jun 2025 · 25/0342

  16. Alterations and additions$230k

    R3 - extension to 2 storey detached dwg.

    5 Foyle Street · 1 Jun 2025 · 555862

  17. Minor dwellings and sleepouts$80k

    Alt dwg - convert studio to bdrm & sitting, relocate laundry & toilet, alt bathrm (wet-area shower), form ensuite & install windows

    210 Doctors Point Road · 1 Jun 2025 · 617/25

  18. Garages, sheds and carports$34k

    Construct gge

    31 Harvey Street · 1 Apr 2025 · BDG/2025/197

  19. New homes$465k

    New two bdrm dwg (to be relocated) housing - detached

    10 Ree Street · 1 Mar 2025 · 25/0120

  20. New homes$362k

    Construct new 2 bdrm home, to be transported out of the

    10 Ree Street · 1 Feb 2025 · 24/0870

  21. New homes$729k

    New dwg with attached gge

    164 Dons Creek Road · 1 Jan 2025 · 1724/25

  22. Plumbing, drainage and wastewater$1

    Amendment to aba-2023-1097 - revise foundation drainage channel

    77 Orokonui Road · 1 Dec 2024 · 1978/24

  23. Alterations and additions$200k

    Extend & alt dwg - extend to form open plan kitchen & sitting area, alt layout of bathrm & ensuite, relocate laundry & install gas hot water system & water tank

    229 Doctors Point Road · 1 Oct 2024 · 1318/24

  24. Fires and heating$7,000

    Install clutha ultra-low emission burner heater in dwg

    2 Killarney Street · 1 Sep 2024 · 1398/24

  25. New homes$450k

    Construction of three bdrm dwg to be re-located off

    10 Ree Street · 1 Aug 2024 · 24/0456

ResidentialCommercial The dots are this page of the list.

Near Waitati

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Dunedin City Council.