Below: 7 commercial consents we hold in Wakefield, searchable and on the map.
Commercial consents on record in Wakefield
Individual building consents we hold, each on its property: 7 from 1 May 2021 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations4
1 in the last 12 months · typically $58k
- Fit-outs1
1 in the last 12 months · typically $90k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $125kEnclose porch, alt internal layout, install ensuite, sink & wall lining to basement office, insulate exterior walls of dwg 19 Harcourt Place, Wakefield
- $90kRbw. Change of use - basement storage area changed to accommodation. Basement internal fit-out. 80% of the basement will be used as accommodation for transient use only & another 20% for their stora 79 Wakefield-Kohatu Highway, Wakefield
7 consents
- Commercial alterations$125k
Enclose porch, alt internal layout, install ensuite, sink & wall lining to basement office, insulate exterior walls of dwg
- Fit-outs$90k
Rbw. Change of use - basement storage area changed to accommodation. Basement internal fit-out. 80% of the basement will be used as accommodation for transient use only & another 20% for their stora
- Commercial alterations$50k
Construct a gge with workshop
- Commercial alterations$65k
Replace gge & re-clad existing workshop
- Commercial alterations$9,000
Add of bathrm to gge/workshop
- Commercial alterations$51k
Construct sleepout & office
- Commercial alterations$49k
Construct detached workshop
ResidentialCommercial The dots are this page of the list.
Suburbs in Wakefield
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.