Building consents
Building consents in Glendhu Bay
Below: 3 consents we hold in Glendhu Bay, searchable and on the map.
Consents on record in Glendhu Bay
Individual building consents we hold, each on its property: 3 from 1 Jan 2026 to 1 Feb 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions1
1 in the last 12 months · typically $500k
- Commercial alterations1
1 in the last 12 months · typically $88k
- Pools and spas1
1 in the last 12 months · typically $150k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $500kProposed 108 sqm eastern add to the existing dwg with the demolition of the existing gge to be replaced by a new 89.6 sqm detached gge 370 Buchanan Rise
- $150kAmendment.02 - construction of an outdoor above-ground swimming pool with associated plant room. Also noted: construction of detached single level dwg part in ground - 600 buchanan rise, Glendhu Bay, including amendment.02 600 Buchanan Rise
- $88kAmendment: 3 x skylights added to roof (2 in wellness office, 1 in port cochere) 600 Buchanan Rise
3 consents
- Alterations and additions$500k
Proposed 108 sqm eastern add to the existing dwg with the demolition of the existing gge to be replaced by a new 89.6 sqm detached gge
- Commercial alterations$88k
Amendment: 3 x skylights added to roof (2 in wellness office, 1 in port cochere)
- Pools and spas$150k
Amendment.02 - construction of an outdoor above-ground swimming pool with associated plant room. Also noted: construction of detached single level dwg part in ground - 600 buchanan rise, Glendhu Bay, including amendment.02
ResidentialCommercial The dots are this page of the list.
Near Glendhu Bay
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.