Building consents
Residential building consents in Tomarata
Below: 11 residential consents we hold in Tomarata, searchable and on the map.
Residential consents on record in Tomarata
Individual building consents we hold, each on its property: 11 from 1 Aug 2019 to 1 Aug 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions3
typically $150k
- New homes2
typically $1.2m
- Garages, sheds and carports1
typically $55k
- Minor dwellings and sleepouts1
typically $7m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
11 consents
- New homes$1.2m
Rbw - new one-storey dwg with two bedrooms, one bathrm, & games room; detached dbl gge with laundry; private sw & ww drainage with onsite dispersal.
- Alterations and additions$150k
RBW proposed outbuilding intended use as a gym for the existing house. Building footprint is rectangular in shape, 40m2 floor area, single story construction.
- Minor dwellings and sleepouts$7m
Rbw - new single level dwg with four-bedrooms, four-bathrooms, kitchen, scullery, dining, media & utility rooms. Separated gge & studio. Swimming pool, gas fireplace & wastewater system.
- Alterations and additions$28k
Rbw - kitchen & bathrm renovation new timber joinery in east wall at bdrm 3
- Alterations and additions$175k
Rbw - amendment to remove the metal cladding over the rammed earth wall at the main entry
- Garages, sheds and carports$55k
Garage
- New homes$1.1m
rbw - new 358m2 2 bdrm, 2 bathrm dwg with laundry & study, internal covered area & dbl gge, carport & decking including new septic drainage. Spa pool on deck & solid fuel heater.
- Pools and spas$95k
new ring 12 x 4.35 m ring fenced concrete swimming pool with fresh water sanitisation system & cartridge filter.
- Minor dwellings and sleepouts$100k
rbw - amendment to revise the cladding system & add decks & verandah's to the sleepout buildings
- Alterations and additions$138k
dismantle & remove the existing bridge. Construct a new 15m x 4m single span bridge using prefabricated components manufactured off site.
- Alterations and additions$350k
owner builder - rbw - new two-storey accessory building, including workshop, one bathrm, family room with decks & new effluent system. New deck & pool area off the existing house to be constructed under schedule 1.
ResidentialCommercial The dots are this page of the list.
Near Tomarata
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.