Building consents

Building consents in Kai Iwi

Below: 45 consents we hold in Kai Iwi, searchable and on the map.

Consents we hold4511 in the last 12 monthsSearch them ↓

Consents on record in Kai Iwi

Individual building consents we hold, each on its property: 45 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Garages, sheds and carports10

    4 in the last 12 months · typically $53k

  2. Alterations and additions5

    3 in the last 12 months · typically $10k

  3. Fires and heating5

    typically $6,000

  4. Relocated buildings4

    2 in the last 12 months · typically $39k

  5. New homes3

    typically $433k

  6. Repairs, recladding and strengthening2

    2 in the last 12 months · typically $91k

  7. Multiple homes1

    typically $1.2m

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01234202420252026November 2023: 2December 2023: 1January 2024: 1February 2024: 0March 2024: 1April 2024: 1May 2024: 0June 2024: 0July 2024: 0August 2024: 0September 2024: 1October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 1December 2025: 0January 2026: 1February 2026: 1March 2026: 1April 2026: 0May 2026: 3June 2026: 0July 2026: 4August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $180kRetruss & reroof the existing house. Remove part walls & add beams & bracing to suit. Add decks & stairs. Freestanding woodburner 11 Mowhanau Drive
  2. $150kSmall extension to an existing gge to create a 2 bdrm, 1 bathrm bach 107A Peat Avenue
  3. $85kConstruct a 11.5m x 8m x 3m totalspan gge 21 Sunset Parade
  4. $57kTo relocate a brand-new, yard-built home to site as per site plan 628C Rapanui Road
  5. $45kConstruct a 8 x 7 x 2.4m totalspan shed building 628 Rapanui Road

45 consents

  1. Alterations and additions$2,500

    Fire installation - second hand freestanding fisher denniston multifuel burner

    104 Bushy Park Road · 1 Jul 2026 · 002117482026

  2. Repairs, recladding and strengthening$1,000

    Alt.1 amended bracing & fixing detail. (retruss & reroof the existing house. Remove part walls & add beams & bracing to suit. Add decks & stairs. Freestanding woodburner)

    11 Mowhanau Drive · 1 Jul 2026 · 26/0043.1

  3. Relocated buildings$42k

    Pim only to relocate this dwg to site as per site plan

    · 1 Jul 2026 · 26/0316

  4. Relocated buildings$32k

    To relocate 3 bdrm dwg with attached gge to site as per site plan

    · 1 Jul 2026 · BCI2600602

  5. Garages, sheds and carports$45k

    Construct a 8 x 7 x 2.4m totalspan shed building

    628 Rapanui Road · 1 May 2026 · 26/0168

  6. Garages, sheds and carports$40k

    Construct a 7m x 7m x 2.4m totalspan gge building

    628C Rapanui Road · 1 May 2026 · 26/0184

  7. Alterations and additions$57k

    To relocate a brand-new, yard-built home to site as per site plan

    628C Rapanui Road · 1 May 2026 · 26/0236

  8. Repairs, recladding and strengthening$180k

    Retruss & reroof the existing house. Remove part walls & add beams & bracing to suit. Add decks & stairs. Freestanding woodburner

    11 Mowhanau Drive · 1 Mar 2026 · 26/0043

  9. Alterations and additions$10k

    Convert bdrm to an 8.0m² en-suite

    711 Rangitatau East Road · 1 Feb 2026 · 26/0029

  10. Garages, sheds and carports$150k

    Small extension to an existing gge to create a 2 bdrm, 1 bathrm bach

    107A Peat Avenue · 1 Jan 2026 · 25/0506

  11. Garages, sheds and carports$85k

    Construct a 11.5m x 8m x 3m totalspan gge

    21 Sunset Parade · 1 Nov 2025 · 25/0525

  12. Alterations and additions$6,000

    Internal dwg alterations - bathrm renovation

    8 Wicksteed Road · 1 Sep 2024 · 133004

  13. Fires and heating$6,000

    Installation of a metro trend inbuilt fire into the masonry chimney

    854 Rapanui Road · 1 Apr 2024 · 24/0135

  14. New homes$350k

    New res dwg construction of a new 2 bdrm dwg

    654 State Highway 3 · 1 Mar 2024 · 2023/438

  15. New homes$529k

    Construct new res dwg

    41 Mowhanau Drive · 1 Jan 2024 · 23/0432

  16. Fires and heating$7,000

    Install a metro tiny rad woody freestanding wood burner into the dining room

    6 Sunset Parade · 1 Dec 2023 · 23/0448

  17. Garages, sheds and carports$40k

    Gge add to home

    643 Rapanui Road · 1 Nov 2023 · 23/0470

  18. Garages, sheds and carports$39k

    Construct a 3.650m wide x 9.500m long monopitch gge

    3 Sunset Parade · 1 Nov 2023 · 23/0535

  19. Alterations and additions$10k

    Removal of walls & installation of beam

    1 Tangi Street · 1 Oct 2023 · 23/0488

  20. Relocated buildings$35k

    House add by attaching a relocated building

    667 Rapanui Road · 1 Jul 2023 · 23/0292

  21. Garages, sheds and carports$105k

    Add to exterior footprint of a new gge. Alt to existing mezzanine, additional floor space & add of new exterior window. Removal of existing freestanding fire

    22 Mowhanau Drive · 1 Feb 2023 · 22/0751

  22. Garages, sheds and carports$30k

    New gge

    96 Peat Avenue · 1 Nov 2022 · 22/0231

  23. Multiple homes$1.2m

    New conjoined two dwgs with attached individual gge

    12 Mowhanau Drive · 1 Nov 2022 · 22/0277

  24. Fires and heating$4,000

    Removing existing wood burner with no wet back & replacing it with a new wood burner Bronte firenzo with no wetback in the lounge

    96 Peat Avenue · 1 Jul 2022 · 22/0418

  25. Fires and heating$5,653

    Install a 'metro smart' insert wood burner into an existing chimney cavity in the living room. (to replace existing insert wood burner)

    · 1 May 2022 · 22/0221

ResidentialCommercial The dots are this page of the list.

Near Kai Iwi

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.