Building consents
Commercial building consents in Manly
Below: 7 commercial consents we hold in Manly, searchable and on the map.
Commercial consents on record in Manly
Individual building consents we hold, each on its property: 7 from 1 Nov 2019 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations3
typically $58k
- New commercial buildings1
1 in the last 12 months · typically $1.2m
- Farm buildings1
1 in the last 12 months · typically $35k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.2mRbw - main dwg with 1 kitchen, 1 living/dining, 1 office/workshop, 4 bdrm, 3 bathrm, 2 wc's. Guest dwg with 1 bdrm & 1 bathrm. 9 Hurdlow Place
- $35kRbw - internal alt to renovate existing bathrm. Existing greenhouse window replaced with profiled metal roofing. Aluminium joinery replaced. Tile shower installed. 13 Laurence Street
7 consents
- Farm buildings$35k
Rbw - internal alt to renovate existing bathrm. Existing greenhouse window replaced with profiled metal roofing. Aluminium joinery replaced. Tile shower installed.
- New commercial buildings$1.2m
Rbw - main dwg with 1 kitchen, 1 living/dining, 1 office/workshop, 4 bdrm, 3 bathrm, 2 wc's. Guest dwg with 1 bdrm & 1 bathrm.
- Commercial alterations$80k
Construction of new 91m2 auxiliary building as a private boat gge & workshop. Single story, suspended concrete floor on piled foundation, & colour steel walls & roof.
- Commercial alterations$58k
new total span shed with gge -workshop, toilet shower area & installation of water tank.
- Commercial alterations$30k
rbw - new single-level detached home office with a bathrm, including one shower & a toilet with a hand basin. A small balcony at a low level will be constructed off the front of the building. Mains water supply.
- Commercial alterations$4,999
Rbw - works included: - the removal of wall between dining & living room with proposed steel portal frame. - new cavity slider between hall & laundry new proposed lintel.
- Commercial alterations$10k
amendment - rbw - removal of workshop building, revised pool side support & small timber slat deck extension
ResidentialCommercial The dots are this page of the list.
Near Manly
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.