Consents on record in Makorori
Individual building consents we hold, each on its property: 13 from 1 Aug 2020 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions3
typically $200k
- Fires and heating2
2 in the last 12 months · typically $8,750
- Retaining walls2
1 in the last 12 months · typically $163k
- Plumbing, drainage and wastewater2
1 in the last 12 months · typically $11k
- Garages, sheds and carports1
1 in the last 12 months · typically $150k
- Minor dwellings and sleepouts1
typically $20k
- Decks, pergolas and verandahs1
typically $90k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $250kConstruct retaining wall 39 Makorori Beach Road
- $150kConstruct first floor deck over existing gge 8 Makorori Beach Road
- $10kInstall freestanding yunca wegj 2000 (sub 1.0) logfire 8 Makorori Beach Road
- $7,500Install freestanding yunca oscar logfire 61 Makorori Beach Road
- $3,000Install new land disposal area for an existing on site waste water system 1087 Whangara Road
13 consents
- Garages, sheds and carports$150k
Construct first floor deck over existing gge
- Plumbing, drainage and wastewater$3,000
Install new land disposal area for an existing on site waste water system
- Fires and heating$10k
Install freestanding yunca wegj 2000 (sub 1.0) logfire
- Fires and heating$7,500
Install freestanding yunca oscar logfire
- Retaining walls$250k
Construct retaining wall
- Decks, pergolas and verandahs$90k
A1: install upper floor deck
- Minor dwellings and sleepouts$20k
Install vanity, shower, & toilet into non consented sleepout
- Plumbing, drainage and wastewater$19k
Install septic system
- Retaining walls$75k
Construct retaining wall, relocate existing wastewater system & demolish existing dwg
- Alterations and additions$200k
Install cable car
- Alterations and additions$200k
Install cable car
- Alterations and additions$35k
New wall & floor tiles on substrate to the two existing bathrooms, new tiled showers & floor drains. New toilet, basin & shower fittings, remove & replace existing windows in the bathrooms only
- Plumbing, drainage and wastewater$17k
Remove existing malfunctioning septic tank & replace with new system
ResidentialCommercial The dots are this page of the list.
Near Makorori
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.