Building consents
Building consents in Whenuakite
Below: 25 consents we hold in Whenuakite, searchable and on the map.
Consents on record in Whenuakite
Individual building consents we hold, each on its property: 25 from 1 Sep 2019 to 1 Feb 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating5
typically $8,000
- New homes2
2 in the last 12 months · typically $394k
- Pools and spas2
typically $85k
- Minor dwellings and sleepouts2
typically $6,500
- Relocated buildings1
1 in the last 12 months · typically $37k
- Repairs, recladding and strengthening1
typically $100k
- Commercial alterations1
typically $40k
- Garages, sheds and carports1
typically $36k
- Alterations and additions1
typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $440kConstruct 3 bdrm dwg, 2 bathrooms & attached dbl gge. 494 Tairua Whitianga Road
- $347kConstruct 59.40m2 dwelling 179 Kapowai Road
- $37kTo build new timber subfloor foundation piles for relocated house, drainage & a new septic tank system. 10 Boat Harbour Road
25 consents
- Relocated buildings$37k
To build new timber subfloor foundation piles for relocated house, drainage & a new septic tank system.
- New homes$347k
Construct 59.40m2 dwelling
- New homes$440k
Construct 3 bdrm dwg, 2 bathrooms & attached dbl gge.
- Fires and heating$8,000
Install new yunca xander insert wood fire
- Fires and heating$8,000
Install new metro mega rad wood fire
- Commercial alterations$40k
Change of use - existing level 2 commercial unit to res unit type 3 fire alarm system to be upgraded to a type 4 (ground floor) & type 5 fire alarm system (upper floor)
- Fires and heating$50k
New 64m2 deck & solid fuel burner
- Alterations and additions$50k
Change of use to res on first level only - new kitchen, laundry & bdrm to first floor only.
- Minor dwellings and sleepouts$5,500
Install new metro tiny rad wood fire in "the sun hut" cabin
- Minor dwellings and sleepouts$7,500
Alt exstg sleepout (under 30sq.M) to include bathrm facilities
- Repairs, recladding and strengthening$100k
Removal of asbestos exterior cladding & then re-clad. Alt some windows/doors, internal wall & install freestanding pyroclassic fireplace.
- Pools and spas$80k
Installation of in ground swimming pool & pool compliant permanent pool fencing
- Fires and heating$4,000
Install wood burner
- Fires and heating$9,000
Install new fisher hanmer wood fire
- Garages, sheds and carports$36k
Construction of 30sqm steel framed gge exempt under clause 2.3 of schedule 1 of building ACT 2004
- Pools and spas$90k
New concrete swimming pool
- Minor dwellings and sleepouts$320k
New cabin - 1 bdrm, 1 bathrm, kitchen including woodburner. New shed including plumbing
- New homes$500k
3 bdrm dwg
- Decks, pergolas and verandahs$19k
Add of upper level waterproof deck & conversion of bdrm to walk in wardrobe plus changes to bathrm layouts.
- New homes$200k
1 bdrm timber framed dwg, ply & batten cladding, colorsteel 35 deg roof. Timber floor.
- Alterations and additions$50k
Add of two extra bedrooms (master with ensuite) to existing dwg
- Relocated buildings$22k
Relocating a second-hand dwg on the subject site. Prepare a new foundation design & bracing for the subfloor & first floor. Design new timber decks & access stairs.
- Fires and heating$3,500
Install replacement metro extreme rad legs free standing fire with eco flue kit, flue shield, metro matched tile hearth.
- New homes$400k
Construct new single level three bdrm dwg with free-standing solid fuel heater & detached gge.
- New homes$750k
Rbw new three storey dwg, including 4 bedrooms, 3 bathrooms, kitchen, dbl gge, laundry. & private drainage.
ResidentialCommercial The dots are this page of the list.
Near Whenuakite
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.