Building consents

Building consents in Ashburton

Below: 1,321 consents we hold in Ashburton, searchable and on the map.

Consents we hold1,321235 in the last 12 monthsSearch them ↓

Consents on record in Ashburton

Individual building consents we hold, each on its property: 1,321 from 1 Jan 2012 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating361

    63 in the last 12 months · typically $6,000

  2. New homes311

    98 in the last 12 months · typically $450k

  3. Alterations and additions128

    29 in the last 12 months · typically $32k

  4. Garages, sheds and carports120

    22 in the last 12 months · typically $40k

  5. Relocated buildings27

    5 in the last 12 months · typically $60k

  6. Multiple homes13

    5 in the last 12 months · typically $1.1m

  7. Pools and spas11

    2 in the last 12 months · typically $95k

  8. Plumbing, drainage and wastewater9

    3 in the last 12 months · typically $5,000

  9. Repairs, recladding and strengthening6

    2 in the last 12 months · typically $33k

  10. Demolition4

    2 in the last 12 months · typically $700k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0204060202420252026November 2023: 10December 2023: 7January 2024: 13February 2024: 4March 2024: 10April 2024: 19May 2024: 12June 2024: 14July 2024: 27August 2024: 22September 2024: 11October 2024: 18November 2024: 17December 2024: 21January 2025: 11February 2025: 17March 2025: 20April 2025: 19May 2025: 30June 2025: 22July 2025: 28August 2025: 20September 2025: 25October 2025: 23November 2025: 24December 2025: 22January 2026: 18February 2026: 21March 2026: 24April 2026: 36May 2026: 42June 2026: 21July 2026: 19August 2026: 7September 2026: 1October 2026: 0

Largest in the last 12 months

  1. $2.6mConstruction of multi-unit dwelling - single storey with 2 X 2 bedrooms & attached garage - Villa - 65 & 67 - Construction of multi-unit dwelling - single storey with 2 X 2 bedrooms & attached garage - Villa - 69 & 71 - Construction of 2 X detached 200 Rawles Crossing Road, Greenstreet
  2. $2.2mConstruction of 3 multi-unit dwgs - single storey 200 Rawles Crossing Road, Greenstreet
  3. $2.1mTwo storey dwg, block basement, 5 bedrooms, including lift 77 Belt Road, Allenton
  4. $2.1mConstruction of new 5 bdrm res dwg with attached gge 117 Creek Road, Allenton
  5. $1.8mSingle level dwg with sfh & attached gge , Allenton

1,321 consents

  1. Alterations and additions$15k

    Remove wall, install shower in laundry of dwg

    35 Grove Street, Tinwald · 1 Sep 2026 · 1063/26

  2. Fires and heating$6,500

    Metro wee rad woody fire

    61 Grove Street, Tinwald · 1 Aug 2026 · 260384

  3. Multiple homes$2.2m

    Construction of 3 multi-unit dwgs - single storey

    200 Rawles Crossing Road, Greenstreet · 1 Aug 2026 · 261869

  4. New homes$380k

    Single level dwg with attached gge

    , Netherby · 1 Aug 2026 · BC0275/26

  5. Garages, sheds and carports$85k

    Pole shed with toilet facilities

    19 Meadowlands Green, Allenton · 1 Aug 2026 · BC0367/26

  6. Fires and heating$6,500

    F/s in alcove metro ultra wee rad

    151 Grove Street, Tinwald · 1 Aug 2026 · BC0466/26

  7. New homes$2.1m

    Construction of new 5 bdrm res dwg with attached gge

    117 Creek Road, Allenton · 1 Aug 2026 · BC260195

  8. Fires and heating$5,000

    Installation of a metro smart insert firebox & fascia (250-0860) & eco insert flue kit (300-0301) with dektite premium flashing into existing masonry cavity smoke alarms interconnected section 2.2 nzs451 4:2021

    8 Westview Drive, Tinwald · 1 Aug 2026 · BC260323

  9. New homes$1m

    Construction of multi-unit dwg - single storey with 2

    200 Rawles Crossing Road, Greenstreet · 1 Jul 2026 · 261539

  10. Fires and heating$350k

    Add/alt & sfh for dwg

    51 Walkhams Road, Ashburton Forks · 1 Jul 2026 · BC0167/26

  11. New homes$400k

    Single level dwg with attached gge

    , Netherby · 1 Jul 2026 · BC0233/26

  12. Garages, sheds and carports$38k

    Gge

    16 Whiteoak Grove, Tinwald · 1 Jul 2026 · BC0250/26

  13. New homes$860k

    Single level dwg with attached gge

    22 Westview Drive, Tinwald · 1 Jul 2026 · BC0276/26

  14. New homes$244k

    Single level dwg with attached gge

    3 Potters Place, Elgin · 1 Jul 2026 · BC0314/26

  15. New homes$322k

    Single level dwg with attached gge

    72 Smithfield Road, Elgin · 1 Jul 2026 · BC0337/26

  16. Relocated buildings$100k

    Single level relocatable dwg

    103 Grove Street, Tinwald · 1 Jul 2026 · BC0348/26

  17. New homes$273k

    Single level dwg with attached gge

    5 Lodge Lane, Elgin · 1 Jul 2026 · BC0351/26

  18. Garages, sheds and carports$112k

    Steel framed shed

    8 Cavendish Street, Allenton · 1 Jul 2026 · BC0353/26

  19. New homes$500k

    Single level dwg with attached gge

    2 Timmins Street, Elgin · 1 Jul 2026 · BC0357/26

  20. Fires and heating$6,500

    F/s masport Kaituna sfh

    128 Melcombe Street, Tinwald · 1 Jul 2026 · BC0363/26

  21. Fires and heating$6,500

    F/s metro ultra extreme rad sfh

    8 Tarbottons Road, Tinwald · 1 Jul 2026 · BC0364/26

  22. Repairs, recladding and strengthening$6,000

    260397 - repair leaking tile shower

    64A Princes Street, Netherby · 1 Jul 2026 · BC/0366/26

  23. New homes$440k

    Single level dwg with attached gge

    8 Mirren Lane, Tinwald · 1 Jul 2026 · BC0378/26

  24. Fires and heating$8,400

    Install a f/ s ravelli, dual 7, pellet fire

    56 Suffolk Street, Hampstead · 1 Jul 2026 · BC0385/26

  25. Fires and heating$120k

    Install f/s rika filo pellet fire

    4 Tranquil Place, Allenton · 1 Jul 2026 · BC0409/26

ResidentialCommercial The dots are this page of the list.

Suburbs in Ashburton

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.