Building consents
Building consents in Winslow
Below: 13 consents we hold in Winslow, searchable and on the map.
Consents on record in Winslow
Individual building consents we hold, each on its property: 13 from 1 Nov 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating5
3 in the last 12 months · typically $6,000
- Garages, sheds and carports3
typically $15k
- New homes1
1 in the last 12 months · typically $295k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $295kSingle level dwg 454 Maronan Road
- $6,500Install a f/s metro mega rad Ltd sfh 12 Winslow Westerfield Road
- $6,000F/s metro xtreme rad Ltd on wetback 541 Hinds Highway
- $5,500F/s metro Ltd xtreme rad leg sfh 43 Winslow Road
13 consents
- Fires and heating$5,500
F/s metro Ltd xtreme rad leg sfh
- New homes$295k
Single level dwg
- Fires and heating$6,500
Install a f/s metro mega rad Ltd sfh
- Fires and heating$6,000
F/s metro xtreme rad Ltd on wetback
- Fires and heating$6,000
Woodsman Tarras mk3 sfh
- Garages, sheds and carports$63k
Pole shed
- Garages, sheds and carports$15k
Pole shed
- Garages, sheds and carports$10k
Pole shed
- Fires and heating$105k
Add to dwg & install logfire
- Alterations and additions$45k
Poleshed
- Fires and heating$720k
Add to dwg, new logfire & add a gge, convert existing gge to bdrm (wastewater system to come in as an amendment), note - kitchen sink to be removed from build
- Repairs, recladding and strengthening$19k
Re-clad dwg
- Garages, sheds and carports$20k
New detached gge
ResidentialCommercial The dots are this page of the list.
Near Winslow
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.