Building consents
Commercial building consents in Devonport
Below: 14 commercial consents we hold in Devonport, searchable and on the map.
Commercial consents on record in Devonport
Individual building consents we hold, each on its property: 14 from 1 Nov 2021 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations9
2 in the last 12 months · typically $300k
- Fit-outs4
1 in the last 12 months · typically $68k
- Farm buildings1
typically $80k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $300kReclad - rbw - reclad one wing of existing house, external walls & roof. Construct 2 story extension containing bdrm on the upper floor, involving adjustment stair landing & office & storage 34A Oxford Terrace
- $15kRbw - amendment to bco10406350 - replacing some existing rotten timber piles with new piles replacing some bearers & adding new bearer lines next to inter-tenancy wall new subfloor bracing calculati 21 Buchanan Street
- $3,000Woodsman uleb freestanding log burner 37 church St Rangiora lot 3 dp 15689 37 Church Street
14 consents
- Fit-outs$15k
Rbw - amendment to bco10406350 - replacing some existing rotten timber piles with new piles replacing some bearers & adding new bearer lines next to inter-tenancy wall new subfloor bracing calculati
- Commercial alterations$300k
Reclad - rbw - reclad one wing of existing house, external walls & roof. Construct 2 story extension containing bdrm on the upper floor, involving adjustment stair landing & office & storage
- Commercial alterations$3,000
Woodsman uleb freestanding log burner 37 church St Rangiora lot 3 dp 15689
- Commercial alterations$300k
Rbw - extension to front of house, extension of roof over consented rear deck, relocation of bathrm, kitchen, laundry, add of scullery, office & ensuite.
- Fit-outs$10k
Rbw - internal fit out of existing bathrm. No additional fittings are proposed.
- Commercial alterations$8,000
Rbw - remove hall walls between kitchen & lounge areas. Install beams to ceiling. Move hall door. Upgrade bracing.
- Commercial alterations$350k
Dbc -rbw - add an alt to an existing dwg with fire damages to the existing roof. Add with new living area. Alt of internal rooms to create new master bdrm with ensuite, office. Redo bathrm, kitchen & laundry in ne
- Commercial alterations$300k
Rbw - construction of new living, dining, kitchen, laundry, & home office add to rear; construction of new timber decking to new living add. Internal alterations to existing dwg; new ensuite bathrm & dressing room to bdrm 1.
- Commercial alterations$450k
Rbw - proposed new dbl gge with office room above. Existing dwg to remove asbestos cladding & replace with new bevelboard to match existing. Existing rear extension to be demolished & replaced with new.
- Fit-outs$485k
Rbw - internal renovation with new beams & bracing, new upstairs bathrm fitout & remedial work to timber joinery & upgraded timber framing.
- Commercial alterations$120k
Rbw - lower fl workshop, concrete foundation,slab, blockwalls, concrete slab roof, alum joinery, toilet. Upper fl gge, timber framed clad, metal roof, alum joinery. Parking area with slab on membrane system, barrier fence. Timber deck with barrier
- Farm buildings$80k
rbw - remove existing kitchen greenhouse window. Construct add to kitchen to replace greenhouse window. New kitchen fittings to replace existing.
- Fit-outs$120k
Rbw - new kitchen living room extension, new bathrm fit out, new covered deck, replacement of existing carport.
- Commercial alterations$250k
Rbw - enclose upstairs balcony to become part of office & new store room. New pergola. New windows. New skylight.
ResidentialCommercial The dots are this page of the list.
Near Devonport
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.