Building consents
Commercial building consents in Howick
Below: 6 commercial consents we hold in Howick, searchable and on the map.
Commercial consents on record in Howick
Individual building consents we hold, each on its property: 6 from 1 Mar 2021 to 1 Feb 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations4
1 in the last 12 months · typically $73k
- Fit-outs1
typically $70k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $50kRbw - convert an existing gge to a bakery workshop for family business, one new basin 1/12 Patons Road
6 consents
- Commercial alterations$50k
Rbw - convert an existing gge to a bakery workshop for family business, one new basin
- Commercial alterations$20k
Install new private stormwater & wastewater drainage to subdivide the property. Obsolete drainage to be abandoned or removed. Inst all two above ground t-bar sw outlets & connecting drainage.
- Commercial alterations$119k
construct a gge with attached office including bathrm.
- Fit-outs$70k
Rbw - internal alterations including new bathrm & laundry fitout with alt to existing drainage & new internal waterproofing under tiles
- Commercial alterations$95k
Rbw - alterations to first floor bathrm, ground floor bathrm, laundry & kitchen, conversion of gge to office with ensuite & bdrm add
- Commercial alterations$45k
Rbw - existing dwg alt: change an existing gge or office to be a minor dwg with 1 bdrm
ResidentialCommercial The dots are this page of the list.
Near Howick
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.