Building consents
Commercial building consents in Narrow Neck
Below: 7 commercial consents we hold in Narrow Neck, searchable and on the map.
Commercial consents on record in Narrow Neck
Individual building consents we hold, each on its property: 7 from 1 Dec 2021 to 1 Oct 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations5
typically $90k
- Fit-outs2
typically $63k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
7 consents
- Commercial alterations$50k
Rbw -internal alt to single storey dwg, to include relocation of the office & lounge, 3 bedrooms in place, new en-suite to bdrm 3, reconfigured wc, bathrm & laundry. Added shower a
- Commercial alterations$120k
Rbw - brand new factory-built dwg to be delivered to site where foundations, construction of decks & retaining walls, connections to existing council watercare services will be carried out.
- Commercial alterations$90k
Rbw - new detached studio office with bathrm
- Fit-outs$95k
Proposed removal of fireplace & wall. New bathrm fit-out. new laundry. New balustrade to existing deck. New window to kitchen.
- Commercial alterations$22k
Rbw - install internal stairs & new exterior door d1 to west elevation. Refurbish existing laundry, bathrm to lower floor. Remove hall & gge walls. New fire rated it wall to lounge space.
- Fit-outs$30k
Rbw - new external aluminum joinery to existing wall, new bathrm fitout.
- Commercial alterations$900k
Rbw - existing 3 bdrm home undergoing a full renovation & extension. The proposed design will have 4 bedrooms, 2.5 bathrooms, l iving, dining, kitchen, office. Much of the existing building is to remain, & be extended. An epa minor being lodge
ResidentialCommercial The dots are this page of the list.
Near Narrow Neck
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.