Building consents
Commercial building consents in Whenuapai
Below: 5 commercial consents we hold in Whenuapai, searchable and on the map.
Commercial consents on record in Whenuapai
Individual building consents we hold, each on its property: 5 from 1 Nov 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations3
2 in the last 12 months · typically $25k
- Farm buildings1
typically $190k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $300kRbw - 2 houses will be relocated to this site. They will be 1 minor dwg & 1 home office. Private stormwater & wastewater systems, retaining wall. 185 Totara Road
- $18kTimatanga community school minor alt to the existing roof. Replacing existing clear lite with new metal roofing by packing existing rafters & extending eaves at front of building. Re-roofin 9 Mamari Road
5 consents
- Commercial alterations$300k
Rbw - 2 houses will be relocated to this site. They will be 1 minor dwg & 1 home office. Private stormwater & wastewater systems, retaining wall.
- Commercial alterations$18k
Timatanga community school minor alt to the existing roof. Replacing existing clear lite with new metal roofing by packing existing rafters & extending eaves at front of building. Re-roofin
- Commercial alterations$25k
Internal bathrm renovations & laundry relocated to
- Farm buildings$190k
construct a 276m2 gge for personal use with 25000 litre tank & overflow trench as per countryside living toolbox. Replacing existing glasshouse, hence no increase in impermeable.
- New commercial buildings$1.8m
rbw - new single storey dwg, 7 bedrooms, 6 bathrooms, kitchen, triple gge, alterations of existing house to a minor dwg & office with fire rated wall, minor unit has one bdrm, one study, two bathrooms, kitchen, dbl gge
ResidentialCommercial The dots are this page of the list.
Near Whenuapai
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.