Building consents
Building consents in Bader
Below: 18 consents we hold in Bader, searchable and on the map.
Consents on record in Bader
Individual building consents we hold, each on its property: 18 from 1 Aug 2019 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating3
2 in the last 12 months · typically $5,000
- Alterations and additions3
1 in the last 12 months · typically $10k
- Multiple homes1
1 in the last 12 months · typically $2.8m
- New homes1
1 in the last 12 months · typically $180k
- Decks, pergolas and verandahs1
1 in the last 12 months · typically $40k
- Garages, sheds and carports1
typically $72k
- Commercial alterations1
typically $20k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.8mConstruction of 6 attached dwgs with attached garages 15 Cleveland Street
- $180kNew detached dwg 1B Odette Street
- $40kReplace existing cladding sheets, cut back existing decking from cladding base to compliant - associated work includes removal of reuse of existing joinery & replacement of timber framing (block aa) 52 Norrie Street
- $10kConverting the main bathrm into 2 bathrooms so the master bdrm will have an ensuite. 26 Pine Avenue
- $8,000Freestanding sfh maxen kinmont 18 Norrie Street
18 consents
- Multiple homes$2.8m
Construction of 6 attached dwgs with attached garages
- Fires and heating$8,000
Freestanding sfh maxen kinmont
- New homes$180k
New detached dwg
- Fires and heating$5,000
Alt to dwg - installation of masport Kaituna wood stacker (ulebs), freestanding, dry, woodburner, cac 234636
- Decks, pergolas and verandahs$40k
Replace existing cladding sheets, cut back existing decking from cladding base to compliant - associated work includes removal of reuse of existing joinery & replacement of timber framing (block aa)
- Alterations and additions$10k
Converting the main bathrm into 2 bathrooms so the master bdrm will have an ensuite.
- Alterations and additions$7,000
Alt to dwg - installation of tropicair duo, freestanding, wet, woodburner, cac165314
- Commercial alterations$20k
Certificate of acceptance - converted the workshop portion outbuildings
- Fires and heating$3,000
Heater
- Alterations and additions$50k
Proposed new house built off site & relocated to 40
- Garages, sheds and carports$72k
To relocate second hand four bdrm dwg & matching gge to site
- Fires and heating$5,587
Install new massport r3000 leg base freestanding solid fuel heater
- Fires and heating$5,000
Install free standing tiny rad solid fuel heater
- New homes$200k
New dwg with attached gge
- Repairs, recladding and strengthening$80k
Repair fire damaged dwg
- Multiple homes$700k
New two storey duplex with attached gge
- Fires and heating$5,473
New free standing masport solid fuel heater
- Insulation$5,000
Install new insulation
ResidentialCommercial The dots are this page of the list.
Near Bader
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.