Building consents
Building consents in Frimley
Below: 176 consents we hold in Frimley, searchable and on the map.
Consents on record in Frimley
Individual building consents we hold, each on its property: 176 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes44
17 in the last 12 months · typically $545k
- Alterations and additions28
5 in the last 12 months · typically $30k
- Fires and heating17
5 in the last 12 months · typically $6,500
- Pools and spas6
typically $7,000
- Garages, sheds and carports5
typically $100k
- Minor dwellings and sleepouts2
1 in the last 12 months · typically $108k
- Decks, pergolas and verandahs2
typically $50k
- Other new buildings1
typically $200k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.6mNew 3 bdrm single storey timber framed dwg replacing a dwg that was destroyed by fire. 818 Pakowhai Road
- $775kNew 4 bdrm dwg with attached gge. 21 Arihi Crescent
- $750kNew 4 bdrm dwg with attached gge. 30 Matau Crescent
- $700kConstruction of dwg with attached gge 10 Donald Place
- $635kNew 4 bedroom residential dwelling with attached double garage 3 Arihi Crescent
176 consents
- New homes$490k
Proposed 3 bdrm dwg
- New homes$560k
Two storey four bdrm dwg with attached single gge
- Fires and heating$6,500
Replace solid fuel heater - firenzo kompact deco.
- New homes$570k
New single level, three bdrm, two bathrm with attached gge house.
- Fires and heating$4,500
Replace existing woodburner with kent Rata insert model
- New homes$600k
New 3 bdrm residence
- New homes$635k
New 4 bedroom residential dwelling with attached double garage
- Alterations and additions$15k
New ranchslider in existing lounge
- Fires and heating$6,000
Install metro eco rad one on corner slimline sheet metal floor protector
- New homes$520k
Proposed 3 bdrm dwg
- New homes$500k
New res dwg
- Alterations and additions$150k
Alterations to dwg
- New homes$480k
Three bdrm dwg
- Alterations and additions$15k
Ensuite alterations
- New homes$700k
Construction of dwg with attached gge
- New homes$1.6m
New 3 bdrm single storey timber framed dwg replacing a dwg that was destroyed by fire.
- Fires and heating$6,500
Replace solid fuel heater - maxen kinmont 350p.
- Alterations and additions$80k
Internal alt
- New homes$775k
New 4 bdrm dwg with attached gge.
- New homes$420k
Rbw - proposed single storey detached dwg with floor area of 167.9m2, 4 bedrooms, 2 ensuites & 1 bathrm, dbl internal gge. Includes stormwater tank, & associated site works, cladded
- New homes$525k
New dwg
- Fires and heating$5,500
Install metro eco smart insert woodburner on insulated hearth 350mm deep x 50mm high
- Minor dwellings and sleepouts$185k
New detached gge with sleepout & bathrm.
- New homes$550k
New dwg
- New homes$530k
Proposed 4 bdrm dwg
ResidentialCommercial The dots are this page of the list.
Near Frimley
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.