Building consents
Building consents in Parkvale
Below: 132 consents we hold in Parkvale, searchable and on the map.
Consents on record in Parkvale
Individual building consents we hold, each on its property: 132 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions31
6 in the last 12 months · typically $29k
- Fires and heating29
8 in the last 12 months · typically $5,500
- New homes10
7 in the last 12 months · typically $544k
- Garages, sheds and carports4
typically $61k
- Pools and spas4
typically $7,000
- Multiple homes2
1 in the last 12 months · typically $2.8m
- Relocated buildings1
typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $5m21 x one & two bdrm, 3 storey walk-up apartments 902 Heretaunga Street East
- $650kNew 2 bdrm brick dwg with attached dbl gge. 1239 Howard Street
- $620kProposed 4 bdrm dwg 1231 Howard Street
- $554kProposed 3 bdrm dwg on proposed lot 11 masters crescent 1239 Howard Street
- $554kProposed 3 bdrm dwg on proposed lot 12 masters crescent 1239 Howard Street
132 consents
- New homes$554k
Proposed 3 bdrm dwg on proposed lot 12 masters crescent
- New homes$533k
Proposed 3 bdrm dwg on proposed lot 14 masters crescent
- New homes$554k
Proposed 3 bdrm dwg on proposed lot 11 masters crescent
- Alterations and additions$5,500
Install mero eco tiny rad on woody base
- Alterations and additions$1
Amendment to aba-2025-621 - alt fire systems, handrail & floor coverings
- Multiple homes$5m
21 x one & two bdrm, 3 storey walk-up apartments
- Fires and heating$5,500
Install metro eco wee rad on base & tiled wall floor protector 900x900mm
- Fires and heating$5,500
Replace existing woodburner with metro eco smart insert woodburner
- Fires and heating$9,000
Replace existing insert woodburner with firenzo aqualux ag with bay door on insulated hearth 420mm deep x 50mm high
- New homes$650k
New 2 bdrm brick dwg with attached dbl gge.
- New homes$501k
Proposed 3 bdrm dwg
- Fires and heating$9,000
Replace solid fuel heater - firenzo lady kitchener ag base with wetback.
- Fires and heating$7,500
Replace solid fuel heater - metro wee rad base with wetback.
- Fires and heating$6,500
Replace solid fuel heater - maxen kinmont 350.
- Fires and heating$6,000
Replace solid fuel heater - metro eco smart insert.
- Alterations and additions$40k
Re pile the building
- Alterations and additions$40k
Alterations & additions to existing dwg
- Fires and heating$6,000
New solid fuel heater - metro rad plus.
- Alterations and additions$20k
Bathrm renovation with tiled shower
- New homes$620k
Proposed 4 bdrm dwg
- Alterations and additions$25k
New ensuite
- New homes$515k
New 4 bdrm dwg with attached gge,
- Fires and heating$4,800
To install a metro tiny rad woody freestanding fire in lounge
- Fires and heating$5,000
Install solid fuel heater - metro tiny rad leg.
- Alterations and additions$29k
Minor alterations to an existing dwg including re purposing existing lounge area into new master bdrm, en- suite & wardrobe
ResidentialCommercial The dots are this page of the list.
Near Parkvale
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.