Building consents
Building consents in Hikurangi
Below: 216 consents we hold in Hikurangi, searchable and on the map.
Consents on record in Hikurangi
Individual building consents we hold, each on its property: 216 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions73
9 in the last 12 months · typically $6,000
- New homes32
8 in the last 12 months · typically $525k
- Fires and heating15
2 in the last 12 months · typically $5,000
- Decks, pergolas and verandahs13
1 in the last 12 months · typically $80k
- Garages, sheds and carports12
1 in the last 12 months · typically $135k
- Relocated buildings8
5 in the last 12 months · typically $70k
- Minor dwellings and sleepouts8
typically $290k
- Pools and spas4
1 in the last 12 months · typically $40k
- Repairs, recladding and strengthening3
2 in the last 12 months · typically $165k
- Plumbing, drainage and wastewater3
typically $12k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.2mNew dwg & swimming pool 78 Onekainga Rise, Whananaki
- $1.2mNew office building & three new dwgs 843 State Highway 1, Hikurangi
- $1.2mNew dwg & swimming pool 118 Rockell Road, Whananaki
- $750kAdditions & alterations to existing dwg - two new bedrooms, bathrm, basement area & extend existing deck 3 Barron Lane, Whananaki
- $550kDwg - unit 4 62 George Street, Hikurangi
216 consents
- Relocated buildings$50k
Relocation of existing dwg - foundations, services, decommissioning of existing cabin
- Decks, pergolas and verandahs$70k
Additions & alterations to existing dwg - new deck, stairs & dining joinery
- Alterations and additions$20k
Alterations to existing dwg. Ribraft concrete pad on existing to lift up ffl
- Alterations and additions$5,700
New heating appliance
- Retaining walls$80k
New retaining walls
- Repairs, recladding and strengthening$300k
Alt to existing dwg - reinstate flood damage
- Alterations and additions$6,000
New heating appliance
- New commercial buildings$1.2m
New office building & three new dwgs
- Alterations and additions$30k
Alt to existing dwg - raise finished floor level.
- Alterations and additions$98k
Rbw - existing roof terrace is to be replaced, with new membrane on ply, with new falls to internal gutter & outlets. Existing balustrade is to have new 1m glass balustrade formed.
- Garages, sheds and carports$200k
Construct new gge with associated excavation & retaining. .Alt & add to existing deck..Install new swim-spa with associated pool fencing & retaining. Upgrade of the wastewater system (reta
- Pools and spas$90k
Installation of swimming pool & fencing.
- New homes$1.2m
New dwg & swimming pool
- Fit-outs$8,000
Alterations to existing shed - internal fitout to provide stables, tack room, toilet & farm kitchen
- Alterations and additions$6,000
New heating appliance
- Repairs, recladding and strengthening$100k
Alterations to existing dwg - re-pile, raise floor level, kitchen, joinery & external stairs
- Relocated buildings$99k
Relocation of existing dwg
- Alterations and additions$3,838
New heating appliance
- Relocated buildings$80k
Foundations for relocatable dwelling
- Alterations and additions$750k
Additions & alterations to existing dwg - two new bedrooms, bathrm, basement area & extend existing deck
- Relocated buildings$60k
Relocation of existing dwg
- Relocated buildings$150k
Relocation of existing dwg & new deck
- New homes$1.2m
New dwg & swimming pool
- New homes$550k
Dwg (unit 2)
- New homes$550k
Dwg - unit 3
ResidentialCommercial The dots are this page of the list.
Suburbs in Hikurangi
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.