Building consents
Building consents in Helena Bay
Below: 11 consents we hold in Helena Bay, searchable and on the map.
Consents on record in Helena Bay
Individual building consents we hold, each on its property: 11 from 1 Apr 2022 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions5
1 in the last 12 months · typically $7,000
- Decks, pergolas and verandahs2
typically $48k
- Garages, sheds and carports1
typically $250k
- Fires and heating1
typically $9,000
- Minor dwellings and sleepouts1
typically $300k
- New homes1
typically $1.2m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $20kAlterations to existing dwg. Ribraft concrete pad on existing to lift up ffl 44 Owai Avenue
11 consents
- Alterations and additions$20k
Alterations to existing dwg. Ribraft concrete pad on existing to lift up ffl
- Alterations and additions$7,000
New heating appliance
- Alterations and additions$10k
Two new heating appliances
- New homes$1.2m
New dwg
- Garages, sheds and carports$250k
New gge & additions & alterations to existing dwg - dining room, lounge & mezzanine floor
- Alterations and additions$6,100
New heating appliance
- Minor dwellings and sleepouts$300k
Additions & alterations to existing dwg - deck, pergola & new effluent system, boat shed with sleepout
- Decks, pergolas and verandahs$70k
Add & alterations to existing dwg - deck, kitchen, dining, ensuite, joinery & cladding
- Decks, pergolas and verandahs$25k
Add & alterations to existing dwg - new deck with roof
- Fires and heating$9,000
Install solid fuel heater - yunca xander masonry into existing cavity
- Alterations and additions$4,800
New heating appliance
ResidentialCommercial The dots are this page of the list.
Near Helena Bay
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.