Building consents
Building consents in Waimatua
Below: 7 consents we hold in Waimatua, searchable and on the map.
Consents on record in Waimatua
Individual building consents we hold, each on its property: 7 from 1 Feb 2020 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating4
1 in the last 12 months · typically $4,500
- Alterations and additions1
1 in the last 12 months · typically $5,000
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $25k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $25kInstall on-site wastewater system 10-16 Waimatua School Road
- $5,000Install f/s maxen cargill 350-d solid fuel burner (replacement) 412 Kennington Waimatua Road
- $5,000Bathrm alt to reline shower walls with tiles 10-16 Waimatua School Road
7 consents
- Fires and heating$5,000
Install f/s maxen cargill 350-d solid fuel burner (replacement)
- Plumbing, drainage and wastewater$25k
Install on-site wastewater system
- Alterations and additions$5,000
Bathrm alt to reline shower walls with tiles
- Fires and heating$5,000
Installation of freestanding wagner leon, replacing existing masport Akaroa, concrete block shielding to be reused with a factor of 0.8
- Fires and heating$4,000
Install f/s Masport Mackenzie R1000 solid fuel burning appliance
- Fires and heating$3,000
Installation of a yunca monte multi-fuel
- Multiple homes$270k
Rbw - new 4-bdrm transportable dwg with freestanding solid fuel burner, new dwg single/semi detached/additions
ResidentialCommercial The dots are this page of the list.
Near Waimatua
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.