Building consents
Building consents in Woodend
Below: 13 consents we hold in Woodend, searchable and on the map.
Consents on record in Woodend
Individual building consents we hold, each on its property: 13 from 1 Feb 2020 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions3
typically $155k
- Fires and heating3
typically $6,500
- Garages, sheds and carports2
typically $24k
- New homes1
1 in the last 12 months · typically $1.2m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.2mNew three bdrm dwg with attached gge 24 Blyth Street
13 consents
- New homes$1.2m
New three bdrm dwg with attached gge
- Garages, sheds and carports$18k
Extension to shed to include 3 bay shed
- Garages, sheds and carports$30k
New shed & carport outbuildings
- Fires and heating$1
Amend 2022/1346 add of second hand fisher-denniston solid fuel burner
- Fires and heating$7,000
Install yunca monte multi-fuel
- Alterations and additions$300k
Rbw alterations to include bathrooms, interior walls removed & portion of exterior walls removed
- Alterations and additions$6,000
Install f/standing jayline fr300
- Fires and heating$6,500
Rbw install yunca monte multi fuel burner, alt to gge wall
- Alterations and additions$155k
Rbw extend dwg, renovate interior, new roof structure & cladding, install yunca monte multi fuel burner
- Insulation$1
Schedule 1 exemption (2) - installation of insulmax blown mineral fiber insulation to the exterior walls of the property.
- Insulation$1
Schedule 1 exemption (2) - installation of insulmax blown mineral fiber insulation to the exterior walls of the property. Details of install itemised in attached existing building assessment
- Garages, sheds and carports$22k
New versatile gge, accessory buildings
- Plumbing, drainage and wastewater$19k
Replace septic tank & new effluent field, plumbing & drainage works
ResidentialCommercial The dots are this page of the list.
Near Woodend
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.