Building consents
Building consents in Broadwood
Below: 50 consents we hold in Broadwood, searchable and on the map.
Consents on record in Broadwood
Individual building consents we hold, each on its property: 50 from 14 Mar 1994 to 1 Sep 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating4
typically $3,000
- Alterations and additions2
typically $5,000
- New homes1
typically $493k
- Relocated buildings1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
50 consents
- New homes$493k
Detached dwg & install onsit
- Fires and heating$3,000
Install of a woodsman kanuku free s
- Fires and heating$3,000
Install of a metro trend insert fir
- Fires and heating$3,000
Install of a metro wee rad leg woo
- Alterations and additions$5,000
Install new wagener cooktop woodbur
- Relocated buildings
Relocate Secondhand Dwelling. Install On-Site Wastewater System
- Fires and heating
Metro Wee Rad Leg Free-Standing Solid Fuel Burner and Flue System in Existing Chimney Cavity
- Alterations and additions
Move Approved Building Consent To Correct Property Parcel
- Fires and heating
Install of a Masport R1200 Leg Free Standing Wood Burner Clean Air, Flue,and Pan Flashing
- Fires and heating
Install of a Masport R5000 Ped Free Standing Wood Burner Clean Air, Flue and Pan Flashing
- Fires and heating
Install Free standing Wagener Leon on corner treadle hearth. New flue system & corrugated iron roof with Dektite flashing & Apron flashing
- Fires and heating
Install a New Jayline SS200L Free-Standing Wood Burner and Flue System
- Alterations and additions
Extension to Existing Dwelling
- Garages, sheds and carports
Construct a New Farm Shed
- Fires and heating
Free Standing Wagener Multi-Fuel Fireplace with Wetback
- New homes
Construct a 3 Bedroom Dwelling and Install a New OnSite Wastewater System
- Fires and heating
Remove Existing Wagener Fireplace with Wetback and Install New Wagener Cooktop Stove with Wetback
- Alterations and additions
3 Bay Pole Farmshed
- Alterations and additions
4 Bay Pole Farmshed
- Fires and heating
Freestanding Fireplace - Milan Rad Rustic
- Plumbing, drainage and wastewater
Replace Onsite Waste Water Treatment
- Alterations and additions
Non-consented Structures (Dwelling)
- Fires and heating
Freestanding Fireplace
- Fires and heating
Freestanding Fireplace
- Fires and heating
Freestanding Fireplace - Cooktop Wagener Stove
ResidentialCommercial The dots are this page of the list.
Near Broadwood
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.