Building consents
Building consents in Kohukohu
Below: 10 consents we hold in Kohukohu, searchable and on the map.
Consents on record in Kohukohu
Individual building consents we hold, each on its property: 10 from 1 Jul 2019 to 1 Jan 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating4
1 in the last 12 months · typically $3,250
- Plumbing, drainage and wastewater2
1 in the last 12 months · typically $49k
- Alterations and additions1
typically $46k
- Decks, pergolas and verandahs1
typically $120k
- Multiple homes1
typically $10.3m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $80kRbw - minor renovation to move existing toilet to create separate wc, move location of existing internal walls to create a new walk-in wardrobe. 9 Yarborough Street
- $7,000Install of a metro wee rad woody, f 234 West Coast Road
10 consents
- Plumbing, drainage and wastewater$80k
Rbw - minor renovation to move existing toilet to create separate wc, move location of existing internal walls to create a new walk-in wardrobe.
- Fires and heating$7,000
Install of a metro wee rad woody, f
- Multiple homes$10.3m
Construction of apartment complex (11 units) - subject to section 77 certificate - subject to a waiver of building code clause c3.6 & c3.7
- Decks, pergolas and verandahs$120k
New exterior timber framed deck, 2m
- Fires and heating$3,000
Install of a metro wee rad base fre
- Plumbing, drainage and wastewater$18k
Install onsite wastewater system
- Fires and heating$3,000
Install masport free-standing wood
- Alterations and additions$46k
Construct a versatile 600 series ga
- Fires and heating$3,500
Metro wee rad leg free-standing woo
- Repairs, recladding and strengthening$40k
Strengthen foundations under house
ResidentialCommercial The dots are this page of the list.
Near Kohukohu
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.