Consents on record in Tī Point
Individual building consents we hold, each on its property: 18 from 1 Mar 2020 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Garages, sheds and carports3
1 in the last 12 months · typically $99k
- Alterations and additions2
1 in the last 12 months · typically $288k
- New homes2
1 in the last 12 months · typically $2m
- Decks, pergolas and verandahs1
1 in the last 12 months · typically $80k
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $18k
- Fires and heating1
typically $7,000
- Pools and spas1
typically $65k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $3.3mRbw. Stage 2 of 2- demolish existing structures (house) & decommission existing wwtp, construct new two storey four bdrm house with gge, pool. Install 2 x concrete water tanks & house wwtp 26 Tatham Road
- $490kRbw - new lounge, dining & kitchen add with new entry canopy & internal alterations with new roof to existing dwg, with new pool. 130 Ti Point Road
- $99kNew dbl gge with storage. Hardies oblique cladding on cavity, coloursteel roof, concrete slab, associated stormwater drainage & new water tank 112A Ti Point Road
- $80kRbw - alterations to existing single level dwg . New timber deck to east, glass balustrade including new glass pool gate. Master bed ensuite altered & upgraded. Re-shuffle of beds two & three 161 Ti Point Road
- $18kInstallation of an awws-5000-c aerobic secondary treatment on-site wastewater system, with effluent disposal via pressure-compensating dripper irrigation. 104 Ti Point Road
18 consents
- Alterations and additions$490k
Rbw - new lounge, dining & kitchen add with new entry canopy & internal alterations with new roof to existing dwg, with new pool.
- Garages, sheds and carports$99k
New dbl gge with storage. Hardies oblique cladding on cavity, coloursteel roof, concrete slab, associated stormwater drainage & new water tank
- Decks, pergolas and verandahs$80k
Rbw - alterations to existing single level dwg . New timber deck to east, glass balustrade including new glass pool gate. Master bed ensuite altered & upgraded. Re-shuffle of beds two & three
- Plumbing, drainage and wastewater$18k
Installation of an awws-5000-c aerobic secondary treatment on-site wastewater system, with effluent disposal via pressure-compensating dripper irrigation.
- New homes$3.3m
Rbw. Stage 2 of 2- demolish existing structures (house) & decommission existing wwtp, construct new two storey four bdrm house with gge, pool. Install 2 x concrete water tanks & house wwtp
- Garages, sheds and carports$100k
Existing gge replaced with new construction. New detached gge to be on new concrete & block footing & concrete slab foundation with timber walls with longrun metal cladding on cavity & pr
- New homes$782k
Rbw - a new dwg with three bedrooms, two bathrooms & a wc. The cladding is brick veneer & lunawood shiplap weatherboard. Like-for-like build, connecting to existing onsite services.
- Alterations and additions$85k
Existing single level three bdrm residence, with proposed alterations to add covered alfresco area to rear of house, with separate wc & basin, & storage room, within alfresco area.
- Fires and heating$7,000
Replacement of insert wood burner & flue
- Garages, sheds and carports$85k
Rbw - add single storey dbl gge to West End of existing house. Timber framed roof & walls on concrete slab on grade.
- Pools and spas$65k
new swimming pool & pool fencing.
- Alterations and additions$80k
Rbw - internal non-loadbearing internal alterations. Change of location for extg kitchen, add of bathrm & laundry. Replacement & add of joinery.
- Pools and spas$25k
new driclad pool & surrounding timber deck with pool fence.
- Fires and heating$4,500
replacement of wood burner & 150mm flue pipes (metro ambie one)
- Alterations and additions$900k
Rbw - proposed extension to existing house consisting of four bedrooms. Proposed new roof & carport. Removal of existing gge.
- New homes$900k
Rbw - new two-storey add to existing concrete basement walls & suspended timber floor. New foundations & sub-floor structure. Four bedrooms, two bathrooms, kitchen & pool. 990mm max retaining wall, new private drainage & on-site water s
- Plumbing, drainage and wastewater$40k
Rbw - conversion of the existing basement tank room into a bdrm & sitting room with bathrm facilities. New storm water detention tank & timber retaining wall. Alterations to the existing storm water drains & down pipes. Effluent field addi
- Alterations and additions$1.5m
rbw - renovation & extension of existing 2 storey res house as well as add of new swimming pool,spa pool & onsite waste water treatment.
ResidentialCommercial The dots are this page of the list.
Near Tī Point
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.