Building consents
Building consents in Fairfield
Below: 92 consents we hold in Fairfield, searchable and on the map.
Consents on record in Fairfield
Individual building consents we hold, each on its property: 92 from 1 Jul 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions14
typically $105k
- New homes6
1 in the last 12 months · typically $496k
- Fires and heating5
typically $5,000
- Multiple homes4
typically $1.6m
- Garages, sheds and carports2
typically $52k
- Commercial alterations2
typically $30k
- Repairs, recladding and strengthening1
typically $42k
- Plumbing, drainage and wastewater1
typically $50k
- Insulation1
typically $1,000
- Relocated buildings1
typically $19k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $600kRbw - housing (detached dwg) - 3 bdrm detached dwg with single internal gge 6 Tilbury Street
92 consents
- New homes$600k
Rbw - housing (detached dwg) - 3 bdrm detached dwg with single internal gge
- Multiple homes$2m
Rbw - housing (detached dwg) - 6x new 2 storey, 3 bdrm townhouses (units 1-6)
- Alterations and additions$1
Amendment 1 - removal of waiver of clause c3.6 & condition
- Alterations and additions$19k
Rbw - housing (detached dwg) - internal alterations, relocate bathrm & create new laundry
- Multiple homes$1.2m
Construction of 6 attached dwgs in 3 blocks subject to section 77 certificate
- Fires and heating$5,000
Install metro Ltd xtreme rad - leg freestanding woodburner
- Alterations and additions$223k
Rbw - housing (multi-unit dwg) - proposed foundations & slabs for townhouses 2 & 3, carport
- Relocated buildings$19k
Rbw - housing (detached dwg) - relocation of the existing dwg to the rear boundary of the site
- Garages, sheds and carports$24k
Outbuilding - new gge to replace existing in new location on site
- New homes$358k
Rbw - housing (detached dwg) - new two bdrm townhouse with multiple cladding types on slab
- Fires and heating$7,000
Housing (detached dwg) - new metro smart insert woodburner & new flue system
- Alterations and additions$45k
Housing (multi-unit dwg) - upgrade existing type 1 fire alarm system to type 5 automatic alarm system (1 - 7 Manderson)
- Repairs, recladding and strengthening$42k
Rbw - housing (detached dwg) - partial underpinning to dwg
- Alterations and additions$200k
Retrofit of existing dwg to improve thermal performance & modernise layout
- Alterations and additions$70k
Rbw - house renovations including bathrm add to the upstairs & update to the kitchen, & new stairs to the main house
- Alterations and additions$200k
Housing - retrofit of existing dwg to improve thermal performance & modernise layout
- Multiple homes$3.5m
Rbw - housing (multi-unit dwg) - four new two-storey duplexes containing eight two-bdrm units
- Insulation$1,000
Exemption - housing - (detached dwg) - insulate existing walls
- Alterations and additions$180k
Rbw - housing (detached dwg) - add to rear of dwg for new family room, & master bdrm suite with wardrobe & ensuite
- New homes$527k
Rbw � housing (detached dwg) - new two storey dwg with 3 bedrooms, 2 wall cladding types & attached single gge (unit a)
- New homes$465k
Rbw - housing (detached dwg) - new two storey dwg with 3 bedrooms, 2 wall claddings & attached single gge (unit b)
- New homes$527k
Rbw - housing (detached dwg) - new two storey dwg with 3 bedrooms, 2 wall claddings & attached single gge (unit c)
- Alterations and additions$10k
Rbw - housing - alterations, new bathrm
- Alterations and additions$80k
Rbw - housing (detached dwg) � extension from storage room for master bdrm suite containing walk-in wardrobe & ensuite, single cladding type & timber foundations
- Alterations and additions$120k
Rbw - housing (multi-res dwg) � internal alterations to enlarge kitchen & make open plan with living room, increase bathrm size, relocate laundry, removal of in-built chimney
ResidentialCommercial The dots are this page of the list.
Near Fairfield
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.