Building consents

Building consents in Point Howard

Below: 37 consents we hold in Point Howard, searchable and on the map.

Consents we hold372 in the last 12 monthsSearch them ↓

Consents on record in Point Howard

Individual building consents we hold, each on its property: 37 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Alterations and additions6

    1 in the last 12 months · typically $123k

  2. Decks, pergolas and verandahs4

    1 in the last 12 months · typically $43k

  3. Repairs, recladding and strengthening3

    typically $35k

  4. Fires and heating3

    typically $5,500

  5. Insulation2

    typically $6,341

  6. Plumbing, drainage and wastewater1

    typically $12k

  7. Pools and spas1

    typically $100k

  8. Garages, sheds and carports1

    typically $40k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01122202420252026November 2023: 0December 2023: 1January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 1August 2024: 0September 2024: 0October 2024: 2November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 0June 2025: 0July 2025: 0August 2025: 1September 2025: 1October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 0April 2026: 0May 2026: 1June 2026: 1July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $25kDemolishing the existing small deck, replacing it with a new one, & extending it. 10 Church Lane
  2. $8,000Construction of an additional bathrm within the existing building envelope. No changes to the external footprint, height, or structure of the building. The new bathrm will include a toilet, shower 7 Howard Road

37 consents

  1. Alterations and additions$8,000

    Construction of an additional bathrm within the existing building envelope. No changes to the external footprint, height, or structure of the building. The new bathrm will include a toilet, shower

    7 Howard Road · 1 Jun 2026 · BCO10409609

  2. Decks, pergolas and verandahs$25k

    Demolishing the existing small deck, replacing it with a new one, & extending it.

    10 Church Lane · 1 May 2026 · BCO10411030

  3. Repairs, recladding and strengthening$53k

    Rbw - housing (multi-unit dwg) - partial repiling of the dwg, additional braces & bearers, remediation of the deck to have a balustrade

    30 Howard Road · 1 Sep 2025 · BC250529

  4. Decks, pergolas and verandahs$25k

    Housing (detached dwg) - deck extension, additional structural post with sub-floor bracing, new pergola & glazed balustrade

    26 Ngaumatau Road · 1 Aug 2025 · BC250455

  5. Pools and spas$100k

    Housing (detached dwg) - construct pool & summer room

    12 Westhill Road · 1 Oct 2024 · BC240533

  6. Repairs, recladding and strengthening$30k

    Rbw - housing (detached dwg) - install new beams & ground screw piles to prop the existing bearer

    32 Howard Road · 1 Oct 2024 · BC240640

  7. Insulation$9,000

    Exemption - housing (detached dwg) - insulate walls

    2 Ngaumatau Road · 1 Jul 2024 · BC240432

  8. Garages, sheds and carports$40k

    Convert gge to 1 x bdrm supplementary unit

    20 Howard Road · 1 Dec 2023 · BC230674

  9. Decks, pergolas and verandahs$60k

    Rbw - housing (detached dwg) - remove conservatory with glass roof on first floor, replace with solid wall with extend tile roofing & new skylight

    67 Howard Road · 1 Oct 2023 · BC230437

  10. Insulation$3,682

    injected wall insulation into an existing dwg

    10 Church Lane · 1 Sep 2023 · BCO10370852

  11. Fires and heating$5,696

    installation of brand new metro wee rad woodfire.

    74 Howard Road · 1 Sep 2023 · BCO10371888

  12. Decks, pergolas and verandahs$430k

    Rbw - housing (detached dwg) - add/alterations, demolish conservatory & deck, new extension for kitchen, laundry, wardrobe, alterations to bathrm & improved vehicle access

    51 Howard Road · 1 Aug 2023 · BC230446

  13. Alterations and additions$200k

    Rbw - housing (detached dwg) proposed single storey accessory building on concrete slab & timber joists with a single cladding type

    4 Howard Road · 1 Aug 2023 · BC230556

  14. Plumbing, drainage and wastewater$12k

    Housing - dwg alterations, add toilet & shower to extended laundry room

    75 Howard Road · 1 Feb 2023 · BC230020

  15. Repairs, recladding and strengthening$35k

    Rbw - housing (detached dwg) - repairs to sub-floor bracing & posts

    60 Howard Road · 1 Jan 2023 · BC221248

  16. Fires and heating$5,500

    Housing � install a new fsf yunca monte woodburner & flue system

    10 Westhill Road · 1 Jul 2022 · BC220770

  17. Alterations and additions$25k

    Rbw - housing - alterations, upgrade established basement flat

    30 Howard Road · 1 May 2022 · BC220156

  18. Fires and heating$5,500

    Housing - install a fsf firenzo topaz freestanding woodburner & new flue system

    54 Howard Road · 1 May 2022 · BC220463

  19. Alterations and additions$860k

    Rbw - housing - add/alterations, construct 2 storey add with ground floor gge

    4 Church Lane · 1 Mar 2022 · BC211572

  20. Alterations and additions$300k

    Rbw - housing � alterations; changes to lower level to sunroom space & internal layouts within the same floor area, external pergola to deck & new entrance way to second floor

    26 Ngaumatau Road · 1 Mar 2022 · BC220128

  21. Alterations and additions$45k

    Rbw - housing - install bi-fold doors to lounge, redesign lounge dining room, new bathrm to upstairs

    16 Ngaumatau Road · 1 Nov 2021 · BC210440

  22. Commercial alterations$10k

    Housing - alterations, move laundry to workshop, install toilet & hand basin

    8 Westhill Road · 1 Sep 2021 · BC211048

  23. Insulation$5,326

    Exemption - housing - install retrofit dry fibre cosywall insulation to external walls

    18 Howard Road · 1 Aug 2021 · BC211001

  24. Fires and heating$6,000

    Housing - install a fsf metro wee rad woodburner onto existing hearth (replace existing woodburner)

    40 Howard Road · 1 Jul 2021 · BC210837

  25. Fires and heating$4,500

    Housing - install an ibf firenzo forte bay insert woodburner & new flue system (replaces existing)

    4A Nikau Road · 1 Jun 2021 · BC210544

ResidentialCommercial The dots are this page of the list.

Near Point Howard

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Hutt City Council.