Building consents
Building consents in Beachville
Below: 12 consents we hold in Beachville, searchable and on the map.
Consents on record in Beachville
Individual building consents we hold, each on its property: 12 from 1 Sep 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating2
1 in the last 12 months · typically $5,500
- Alterations and additions2
typically $116k
- Minor dwellings and sleepouts1
1 in the last 12 months · typically $9,000
- New homes1
typically $750k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $9,000Warmington studio stove 14 fir 24 Fountain Place
- $5,000Masport r1200 leg fire 25 Stanley Crescent
12 consents
- Minor dwellings and sleepouts$9,000
Warmington studio stove 14 fir
- Fires and heating$5,000
Masport r1200 leg fire
- Alterations and additions$2,000
Amendment 1 - fire wall extension & bringing existing firewall up to code. New rainwater head to suit height change in roof.
- Fires and heating$6,000
Installation of solid fuel heater - metro wee rad woody
- New homes$750k
Construction of dwg with attached gge subject to section 73 notice
- Alterations and additions$230k
Add & alt to dwg - add of bedrooms, ensuite, laundry & pantry & construction of detached gge. Subject to s73 certificate
- Fires and heating$4,000
Install masport r3000 woodstac
- New homes$525k
Dwg & retaining wall
- Alterations and additions$6,500
Install pyroclassic iv fire
- Alterations and additions$6,500
Install pyroclassic fire
- New homes$396k
4 bdrm domestic dwg (dinex codemark) with attached, ...
- Fires and heating$5,500
Install masport r5000ws fire
ResidentialCommercial The dots are this page of the list.
Near Beachville
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.