Building consents
Building consents in Toi Toi
Below: 33 consents we hold in Toi Toi, searchable and on the map.
Consents on record in Toi Toi
Individual building consents we hold, each on its property: 33 from 1 Jul 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions9
2 in the last 12 months · typically $9,000
- Fires and heating6
typically $5,000
- New homes4
1 in the last 12 months · typically $500k
- Garages, sheds and carports3
1 in the last 12 months · typically $41k
- Decks, pergolas and verandahs2
typically $43k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $540kAlt to an existing dwg including rebuilding the detached dwgs 2 Tui Way
- $450k3-bdrm dwg with attached gge 18 Golden Elm Rise
- $35kConstruct a 6m x 6m x 2.4m totalspan gge 37 Toi Toi Street
- $25kWet area vinyl shower 19A Murphy Street
33 consents
- Alterations and additions$540k
Alt to an existing dwg including rebuilding the detached dwgs
- Alterations and additions$25k
Wet area vinyl shower
- Garages, sheds and carports$35k
Construct a 6m x 6m x 2.4m totalspan gge
- New homes$450k
3-bdrm dwg with attached gge
- Fires and heating$6,000
Masport Kaituna fire
- Alterations and additions$4,140
Rbw - housing (detached dwg) - construct an access hatch through the perimeter foundation wall of dwg
- Decks, pergolas and verandahs$20k
Foundations, deck, handrail, balust
- Alterations and additions$9,000
Install pyro classic fire
- New homes$550k
4 bdrm dwg & retaining
- Alterations and additions$9,000
To replace existing inbuilt fire with new firenzo forte bay detached dwgs
- New homes$590k
Construction of a 4 bdrm, 2 bathrm dwg with woodsman
- New homes$400k
3-bdrm dwg with internal gge
- Decks, pergolas and verandahs$65k
Rebuild existing upper level deck
- Fires and heating$6,500
To install a Metro Tiny Ped free standing woodburner ancillary
- Alterations and additions$37k
Bathrm alterations
- Alterations and additions$2,000
Amendment to remove 137 Toi Toi
- Fires and heating$3,000
Woodsman Serene ULEB freestanding logburner Clean Air 194586 3 Tui St Oxford lot 12 DP 18585
- Garages, sheds and carports$180k
Gge with craft room & bathrm
- Alterations and additions$25k
Install internal wall & kitchen
- Fires and heating$5,000
Install metro eco wee rad wood
- Fires and heating$5,000
Install metro eco wee rad leg
- Alterations and additions$8,000
Install firenzo lady kitchener
- Fires and heating$5,000
Install woodsman Totara inbuilt
- Garages, sheds and carports$41k
Demolish sheds & build gge
- Multiple homes$1.6m
6 dwgs & retaining walls
ResidentialCommercial The dots are this page of the list.
Near Toi Toi
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.