Building consents
Residential building consents in Horeke
Below: 39 residential consents we hold in Horeke, searchable and on the map.
Residential consents on record in Horeke
Individual building consents we hold, each on its property: 39 from 4 Aug 1993 to 5 Oct 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions3
1 in the last 12 months · typically $4,750
- Relocated buildings2
1 in the last 12 months
- Fires and heating2
typically $3,000
- Other new buildings1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
39 consents
- Alterations and additions
Proposed New Residential Dwelling
- Relocated buildings
RBW - new relocatable dwelling, timber pile foundations, timber deck & balustrade, on site ww, plumbing & drainage
- Alterations and additions$6,500
Installation of a jayline fr300 woo
- Relocated buildings
Foundations for relocated dwelling and wastewater system
- Alterations and additions$3,000
Install of a xtreme rad base free-s
- Other new buildings
Erect new steel portal framed farm building
- Fires and heating
Install of a Masport R3000 Leg Free-Standing Wood Burner (Clean Air), Flue, Pan Flashing and Drop Box
- Fires and heating$3,000
Install masport r3000 leg free-stan
- Fires and heating$3,000
Install of a metro eco tiny ped fre
- Fires and heating
Install Freestanding Masport R1500 Leg Fireplace and Flue
- Fires and heating
Install Firenzo Bronte Leg Free Standing Wood Burner and Flue
- Garages, sheds and carports
Construct 3 Bay Pole Shed with Iron Sides
- Alterations and additions
Additions and Alterations to existing building
- Relocated buildings
Foundations and Drainage for Relocated Dwelling (Replacing Burnt Dwelling)
- Alterations and additions
Level Access Shower
- Plumbing, drainage and wastewater
Construct new Wharekai, Wharepaku and new Onsite Effluent Disposal
- Garages, sheds and carports
4 Bedroom Dwelling with Attached Garage and Solar with On Site Disposal System
- Plumbing, drainage and wastewater
Install Onsite Effluent Disposal System
- Relocated buildings
Relocate ex showhome onto site, connect services, and construct subfloor.
- Alterations and additions
5 Bedroom, 2 Storey Dwelling
- Relocated buildings
Relocate Sunshine Home & Construct Farm Building
- Alterations and additions
Addition to Existing Dwelling VAL
- New homes
NEW DWELLING VR
- Fires and heating
RESIDENTIAL: NEW DWELLING & FIREPLACE LOT 2 DP 159938
- Alterations and additions
No description given
ResidentialCommercial The dots are this page of the list.
Near Horeke
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.